Conveyance Vs Deemed Conveyance

Conveyance Deed is a document executed to transfer the title of land and building in favour of Society.

MEANING OF DEEMED CONVEYANCE:

The Promoter (Builder/ Developer) is legally required to convey the land and the building within 4 months of formation to the society or any legal body of the flat purchasers. However, it has been the experience that many promoters (Builders/Developers) have not conveyed the land and building to the legal bodies. Therefore, government has amended the Maharashtra Ownership Flats Act, 1963 (MOFA) and provided for the deemed conveyance in favour of the legal bodies. Under the provision, deemed conveyance means after the expiry of 4 months of formation of the legal body, the land and building is deemed to have been conveyed to the legal body and to bring the same in the revenue record, a Competent Authority has been designated who will hear the parties on the basis of applications received from the aggrieved party and transfers the title in favour of the legal body by passing the necessary order and deemed conveyance certificate and appoint an authorized officer to execute the conveyance deed in favour of the society and execute on behalf of non co-operative builder or the land owner. Getting the title of land and building by adopting the above procedure is known as deemed conveyance.

DIFFERENCE BETWEEN THE DEEMED CONVEYANCE AND THE REGULAR CONVEYANCE

In case of regular conveyance, the builder/ Developer/ Land owner prepare a conveyance deed, execute the same and appear before the Sub-Registrar of assurance for admitting their signature. Without any problem, the legal bodies get the conveyance with the co-operation of the builder/ landowner.

In case of deemed conveyance, the builder/ land owner or their legal heirs are not co-operating, therefore, the aggrieved parties appear before the Designated Competent Authority, who hears all the parties and passes the necessary order of conveyance. Deemed Conveyance is obtained as a legal remedy against the defaulter builder/ landowner who don’t want to part with the land and the building in favour of the society.

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 10th, 2018|Uncategorized|Comments Off on Conveyance Vs Deemed Conveyance

SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER

The Registration process and requirements are governed by Maharashtra State Co-operative Society Act 1960.

To Register Co-op. Housing Society, Minimum 10 member are required.

Less than 10 members Societies are also Registered as per M.S.Govt. Ordinance No. 1094 and 277/14 Dated 10/03/1995. But such member’s flats should be less than 700 Sq.ft. Carpet Area

As per M.S. Govt. Notification dated 24/07/1992 conditions for registrations are liberalized.

60 % of the Promoters are must be ready to form Co-op. Housing Society.
If flats are sold as per the Maharashtra Ownership Flats Act,1963 [MOFA] then it is the duty of the Builder / Developer to form society and hand over the Account + Documents to Provisional Working Committee [PWC] In this case the builder become CP and other flat owners become Promoters for Registration purpose. This society registers under Co-operation.
When the builder is not registering society due to some reasons or not support to registered society then flat purchasers can apply for registration of Co-operative Housing Society under Non Co-operation. In this case one of the flat owners should be elected as CP for Registration purpose. In this case some more time is taken to registered society as registrar is issue notice to builder for Non Co-operation. If no response then ex-party decision are taken for registration of the society. Now all the case of Non Co-operation Registration decisions is given by District Deputy Registrar [DDR] then society is registered
All flat owners should hold meeting and elect Promoter. All power for Registrations, documentation etc. should be given to promoter. The resolution should be passed and must be sign by all flat owners who wish to become member of the Co-operative Housing Society
Appoint Consultant / Legal Advocate for registration and ask him to comply all requirements. All members together also can do work for registration.
For registration of Co-op. Hsg. Society the following documents should be filed to Dy. Registrar / Asst. Registrar of Co-operative Department area concern in order as follow:
• Applications for Name to be reserved for Proposed Society’s
• Form of resolution electing a CP and Promoter and giving them authority for doing certain acts on behalf of the proposed society
• Notice to Builder
• Application form “A”
• Information in Annexure ” A ” ” B ” ” C ”
• Bye-Law of the Society 2 copies
• Details of Accounts Annexure ” D ”
• Bank Balance Certificate in Original
• Namuna 6
• Agreement of 1 Flat
• Advocate Search Report [Title Certificate]
• Society’s Building Plan
• Lay Out Plan
• Sanction Plan from Authority
• Commencement Certificate
• Completion Certificate
• Promoter’s Guarantee in form ” X ” On Rs. 100/- Stamp paper & notarized
• Guarantee in form” Y ” On Rs. 100/- Stamp paper & notarized
• Guarantee in form ” Z ” On Rs. 100/- Stamp paper & notarized
• Latest 7/12 or City Survey Revenue Record of Land [not more than 1 month old]
• Promoters Affidavit On Rs. 100/- Stamp paper & notarized
• Indemnity Bond On Rs. 100/- Stamp paper & notarized
• NA Order
• ULC Order
• Development Agreement and Power of Attorney
• List of Members in the society
• Scheme/Yojana Form
• Registration Fee Challan for Rs.2500
• Builder Non Co-operation form Z On Rs. 100/- Stamp paper & notarized if required 1 copy
On submission of above document the Dy./Asst. Registrar will go through the papers And document. If found OK he will make order for issue of Registration Certificate.
If any deficiencies are found then the applicant will be inform accordingly and documents will be corrected wherever necessary. When all papers are in order, he will issue order for issue of Registration Certificate.
Registration Certificate is issued with covering letter and Officer’s name is mentioned who will attend First General Meeting. Normally the Officer concern is not attending meeting. In absence, all members has to hold meeting and has to elect Provisional Working Committee [PWC] whose working period will be ONE Year.
After electing PWC the member of PWC has to submitted the M-20 bond on Rs. 100/- stamp paper with the sign of Officer’s whose name is in Covering latter to Dy./Asst. Registrar. All Rule and Regulations, resolution and minutes which is written in AGM Register must be sign by Officer’s name is mentioned in covering letter it is the most important step.[Many society forget this which create problem latter] After First Annual General Meeting PWC is replaced with new Working Committee [WC] whose working period will be FIVE Year. The new WC election can conduct before PWC time over with proper election process. WC also has to submitted the M-20 bond on Rs. 100/- stamp paper with the sign of election officer to Dy./Asst. Registrar.
When application for Name reservation of Society has given, the Dy./Asst. Registrar give instruction to Open Bank Account in Dist. Central Co-op. Bank The Account has to opened in the name of CP And deposit all money of Share Capital Contribution [per member Share Money is Rs. 50*10 = Rs. 500 i.e. 10 share of 50 rupees each] and Member ship Fees of Rs. 100/- i.e. Per member you have to deposit Rs. 600/- in bank and obtain Bank Balance Certificate and submitted it to Dy./Asst. Registrar. After First Annual General Body Meeting the Bank Account has to transfer in the name of Society. For bank Account operation Chairman sign must and either Secretary and Treasurer. Expenditure has to be made as per provision of Bye-Laws. Bank and Cash Transaction [Collection and Payment are handled by Treasure when Billing Clerk or Accountant are not been kept.

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 10th, 2018|Uncategorized|Comments Off on SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER

ADVOCATES FOR REGISTRATION OF HOUSING SOCIETY

A co-operative society is the perfect fit for a residential building as flat-owners have common needs (water connection, watchmen, etc) and interests (maintenance of common areas, such as the terrace and compound). If you’ve purchased a flat in a new building, it would probably be best if you took interest in forming a society. The builder may also be statutorily obligated to form a society. For example, under Maharashtra Flat Ownership Act, 1963, a builder must form a society within four months of selling 60% of the flats.
But you needn’t wait for the builder to form the society. In many states, including Delhi and Maharashtra, ten flat-owners are enough to promote a co-operative housing society. A building without a housing society usually indicates that there is a dispute between members or a general lack of interest. If you’re considering buying a house in a building where the society has not been formed, find out what the problem is. If the builder does not form a society, rights to the terrace and the compound continue to rest with him.
We, the “VED LEGAL” provide registration and formation services which help you at every step of society formation, right from inception to final handover. We look after all the legal complications involved in society formation and carry out necessary negotiations with developers.
We have also completed the registration process for various projects. We specialize in society formation of housing societies, commercial societies, maintenance societies and large townships. We help developers and societies with complex registration process during society mergers, society split, and federation registrations.
Our specialized services include:
• Initial screening
• Gap identification and ratification
• Process documentation and finalization
• Dispute resolution
• Society name reservation at respective co-operative departments
• Account formation and legal documentation

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 10th, 2018|Uncategorized|Comments Off on ADVOCATES FOR REGISTRATION OF HOUSING SOCIETY

PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

Amendments in Maharashtra Ownership Flats (Regulation of the promotion of construction, sale, management and transfer) Act, 2005 giving a huge relief to hundreds and thousands of flats purchasers in Maharashtra. Conveyance to the societies was a burning issues which have integrated many problems like property tax, housing finance documentations and major repairs or redevelopment.

The highlights of the amendments are as under:
• Builder/s will have to execute the conveyance.
Power is given to the District Deputy Registrar to act as Competent Authority. (Sec. 5A)
• Power is given to Competent Authority for registration of Co-operative Society under the provisions of Maharashtra Co-operative Societies Act, 1960. (Sec. 10(1) )
• It is the duty of the promoter (builder) to file with the Competent Authority within the prescribed period a copy of the conveyance executed by him (Sec. 11(2))
• If the promoter fails to execute the conveyance in favour of Co-operative Society, Company or Associations or Apartment Owners as the case may be, then the flat purchasers can approach the Competent Authority with true copy of registered agreement of all the flat purchasers including Occupation Certificate, Registration Certificate of the society then in such circumstances the Co-operative Society, Company or Associations is entitled to have unilateral deemed conveyance (Sec. 11(3))
• The proceedings before the Competent Authority have to be completed within a period of 6 months. The Competent Authority must verify the authenticity of the document produced before him and after giving a reasonable opportunity to the promoter, if satisfied will issue a certificate to the Sub-Registrar or any other Registration Officer under the Registration Act, 1908, certifying that it is a fit case for enforcing unilateral execution of conveyance deed conveying the right, title and interest of the promoter in the land and the building in favour of the applicant, as deemed conveyance(Sec. 11(4))
• The sub registrar after receipt of the certificate issued by the Competent Authority along with the unilateral instrument of conveyance can issue summons to the promoter to show cause why the unilateral instrument should not be registered as deemed conveyance. However, reasonable opportunity of being heard may be given to the promoter. If the Sub-Registrar is satisfied then he will register the unilateral conveyance as ‘deemed conveyance’. (Sec. 11(5))
• The Competent Authority has been created who has powers to award criminal imprisonment to the builder/s for a period not less than 6 months and not more than 1 year and / or along with fine ranging from Rs 10,000/- to 50,000/-. (Sec. 13(3)(a) & 13(3)(b))
• The builder/s if convicted will not be able to carry on construction activities for a period of five years. However, the disqualification shall not affect the permission for construction of flats already granted. (Sec. 13 (4), 13(5) & 13(6) )
• The Competent Authority shall be deemed to be a public servant as per the provisions of Indian Penal Code. (Sec. (13B)
• Proceedings before Competent Authority shall be aimed to be judicial proceedings as per the provisions of Indian Penal Code. (Sec. 13C)
• Competent Authority shall be deemed to be a Civil Court for certain purposes. (Sec. 13D)
• No action can be taken against the Competent Authority for acts done in good faith by the Competent Authority. (Sec. 13E)
FOR MORE DETAILS CALL:
VED LEGAL,
• Adv. Gajanan Rahate
• Mob: 9763040088
• E_mail: [email protected]

By |September 8th, 2018|Uncategorized|Comments Off on PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

Advocates for Deemed Conveyance Process in Pune

A COMPLETE GUIDE TO DEEMED CONVEYANCE

Most of the flat-owners of the newly constructed Societies/apartments do not have their sale deeds or conveyance deeds. Mostly in the newly constructed buildings, the builders provide for forming a housing co-operative society to which they shall transfer their interest in the property. Then the builders form the society but do not transfer the title of the property (read ownership) to the flat-owners or the society till he has transferred all the rights in the building/ Societies/apartments. Thus the builders/promoters are benefiting from the buyers lack of awareness and information.
To curb this practice, amendments were carried out in the Maharashtra Ownership Flats Act, 1963, in 2008 to appoint a Competent Authority (Registrar of Co-operative Housing Societies) to hear the grievances of such Societies/apartments owners and to safeguard their interest by executing deemed conveyance of such societies u/s 11(3) of Maharashtra Ownership Flats Act, 1963.
Ved Legal is having enough experience to deal with these kinds of Deemed Conveyance of Co-operative Housing Societies, in and around pune. Any aggrieved society or apartment holder can get resolution from us in regards of the same.
MEANING OF CONVEYANCE:
Conveyance means to transfer or convey anything to another person. In the legal sense Conveyance refers to the transfer of ownership or other interest in the property to the other party. Conveyance Deed is a document executed to transfer the title of land and building in favour of Society or Association of Persons (AOP).

MEANING OF DEEMED CONVEYANCE:
A deemed conveyance means when the builder/ promoter/ developer of the project refuses to sign the conveyance deed the court can sign the same on behalf of the builder and record the same in the government records.

NEED FOR DEEMED CONVEYANCE:
In a situation when a promoter or owner of residential premises/ buildings does not transfer/convey the ownership of the flats to the housing society or association of persons (AOP), the society or AOP can make an application to Registrar of Co-operative Housing Societies, to transfer the ownership of the said flats to them. This process is carried on through Deemed Conveyance of the title of the buildings and land in favour of the Society or AOP without the need of the builder to do so.

IMPORTANCE AND PROVISION OF LAW ON CONVEYANCE:
As per the Housing Society bye-laws, the main objective of formation of the Society is to obtain the Conveyance; and if Conveyance is not given by the Builder within four months from the date of registration of the Society, a case can be filed against the Builder to obtain the Conveyance. As per Section 13 of Maharashtra Ownership Flats Act, 1963, failure to give Conveyance is an offence and the Builder can be imprisoned up to 3 years or fined or both.

ADVANTAGES OF CONVEYANCE:
1. Getting a proper and legal title in the name of the Society.
2. Retaining the additional FSI as per the Government announcements.
3. Property will be free and marketable.
4. Society can raise the loans for repairs and reconstruction by mortgage.
5. Permission from planning authorities is possible if the building has to be reconstructed at a later date due to dilapidation of the structure due to age or by earthquake.
6. Society can take the benefit of TDR.
7. Members can receive compensation from Builder on redevelopment of the building.
DISADVANTAGES OF NOT HAVING CONVEYANCE DEED
Even though you have purchased ownership flat, you are not the owner of the land and building. 2. In the event of a building collapse or damage to the building, you cannot reconstruct the building without the permission of the Builder / Land owner.
1. The Builder/Developer may mortgage the property purchased by you as he is the legal owner and holding the Title Deeds of the Property.
2. The Builder/Developer may tap the benefits in case the building is later taken up for redevelopment or if the plot has some unutilized floor space index.
3. The Builder may make profit by sale of open spaces, gardens, terrace, parking space belonging to the Society.
4. The Builder may demand a huge amount from the Society, if Conveyance is sought by the Society after a lapse of many years.
5. The Builder may sell the entire Development Rights and the Legal Rights on the land to third party and create a third party interest in the Property and the Society will have to incur a huge amount to clear the same.
CONDITIONS PRECEDENT FOR GETTING A DEEMED CONVEYANCE:
There are certain important conditions which need to be fulfilled to go ahead for deemed conveyance, some of them are:

1. At least 60% of the flats in that scheme should be sold.
2. A Co-operative Society or Association of Persons should have been formed of the flat-owners and at least 3-4 months should have been passed since then.
3. There should be communication between the builder and the society or AOP regarding Deemed Conveyance wherein the builder should have made a promise of completion of conveyance or refused to do the same.

PROCEDURE FOR FILING AN APPLICATION FOR DEEMED CONVEYANCE:
After the above mentioned conditions are fulfilled, the following steps shall be taken:
Write a letter /email to builder/ promoter requesting him to provide a draft of the SALE DEED/ CONVEYANCE DEED or providing the draft to him and requesting him to sign the same.
• If the Builder rejects or postpones the same, send him a legal notice through an advocate requesting for the same.
• Even then if the builder refuses, File an application with the Registrar of Co-operative Societies together with all the relevant documents and 2000 Rs. Court stamp fees.
• Self-attestation all the copies enclosed (by the society)
• The Competent Authority will assess the application and if any documents are missing he will ask the applicant to correct the mistake within fifteen days.
• Thereafter, notice would be sent to the promoter and the land owners.
• After receipt of the notice by the land owners and the promoters, the authority will hear both parties in the first hearing and ask both parties to produce further evidences in next hearing.
• Thereafter, second hearing would be held and if the builder or landowners do not attend both first and second hearing then the authority will pass an exparte order.
• Thereafter, the third and final hearing would be held and the authority would be held and order would be passed unless a legal question is raised.
• Normally the whole process is completed within a period of 6 months.
DOCUMENTS REQUIRED:
Further, the application required to be made with the Registrar shall be accompanied by copies of certain 20 odd documents which the society shall have to prepare or get prepared.

The papers required for doing Deemed Conveyance are as follows:
o Application Form 7 to the District Deputy Registrar, Co-operative Societies, affixing a court fee stamp of Rs 2,000 on the application
o Affidavit made before the Notary or Executive Magistrate True copy of the Society Registration Certificate
o Stamp duty paid and registered agreement copy of 1 individual flats/ shops with Builder/Developer
o List of members in prescribed format
o Index-II for each member as issued by the Sub-Registrar of Assurance
o Copy of the Development Agreement between land owner and builder
o Copy of the Power of Attorney between land owner and builder
o Copy of the legal notice issued to the original owner or developer for doing conveyance
o Details of corresponding address telephone number etc. of the original owner or developer
o Draft conveyance deed/ Declaration proposed to be executed in favour of the applicant

Documents to be obtained from City Survey Office, for submission:
o City (CTS) Survey plan
o Property Registration Card or
o 7/12 extract of the land
o Village form 6 (Mutation entries from Revenue Office)

Documents to be obtained from the Collector’s Office, for submission:
o Copy of the Non-Agricultural Order
o Certificate of the exclusion from Land Ceiling Act (ULC) Certificate

Documents to be obtained from the concerned Municipal Authority Office, for submission:
o Copy of the approved plan
o IOD
o Commencement Certificate
o Building Completion certificate
o Occupation Certificate (not compulsory)
o Property taxes paid
o Location plan of the building

Documents to be obtained from other professionals, for submission:
o Search Report of the land issued by the Solicitor/Advocate
o Title Certificate of the Property issued by the Solicitor/Advocate (Search by minimum for last 30 years)
o Land Measurement Map/ Architect’s Certificate (layout plan of the plot)
o Certified copy from Panel Architect about the utilization of full FSI or FSI if any left in respect of the said property /Plot.
After, the Application is heard by the Registrar he may grant an order for deemed conveyance which shall then be produced before a court for execution and hence the conveyance may be done by a court order.
PROCEDURE:
Stage 1- Preparation for Deemed Conveyance
During this stage the Managing Committee prepares the Members of the Co- Operative Housing Society for Deemed Conveyance.
Stage 2- Documentation for Deemed Conveyance
During this stage the Documents Required for Deemed Conveyance are collected/ organized & the Case is prepared.
Stage 3- Legal Case for Deemed Conveyance
During this stage the case is filed before the Competent Authority & after contesting the same the Order & Certificate upholding the right of Deemed Conveyance of the Society is obtained.
Stage 4- Registration of Deemed Conveyance
During this stage the Deemed Conveyance Deed is Adjudicated, properly Stamped & Registered.
Stage 5- Transfer of Property after Deemed Conveyance
During this stage the Society Name is incorporated in the Land Revenue Records.
Let’s discuss each step in detail:

1. Preparation for Deemed Conveyance:
In this stage the managing committee needs to pass resolution to undergo deemed conveyance. A Special General Meeting is scheduled with prior notification and consent of all the members is obtained to move ahead.

During this SGM the following Resolutions are typically passed.
1. Resolution for going ahead with Deemed Conveyance
2. Resolution for Appointment of Authorized Representative
3. Resolution for Appointment of Legal Consultant for Deemed Conveyance
4. Resolution for Per Member Contributions
2. Documentation for Deemed Conveyance:
This is the most crucial step in obtaining deemed conveyance. It is a very meticulous job and make sure all the documents are lined up within the right format. You would require land revenue records, municipal corporation records, society records, property development records and professional certificates.
All these documents can be obtained from various departments such as Land revenue records from City Survey Office, Tahasildar/Talathi Office & District Collector Office, municipal corporation records from Building Proposal Department of the Municipal Corporation. Society records and certificates can be obtained from society offices and professionals.
Once all the documents are lined up, society needs to fill in Deemed Conveyance Application- Form VII and attached all the related documents. In case of deemed conveyance, a legal notice is sent to the developer for their consent. In regular conveyance procedures, since the developers or promoters are willingly providing the rights lot of documents can be easily recovered from them.
Once the form is filled up and all documents are annexed it is submitted to the Competent Authority- the District Deputy Registrar of Co- Operative Societies of the particular District.
3. Legal Case for deemed conveyance:
Once the application is submitted to the authorities they issue Deemed Conveyance Scrutiny Report- Form VIII within 1 month. Once the compliance is provided the authorities issues Summons & Newspaper Notices to the Land Owners & Property Developers for appearing for the hearing.
During the hearing process authorities take into consideration the arguments of the both parties. The process takes place within 3-4 months. Once all the arguments are documented the office issues a Deemed Conveyance order within 1 month. The whole process is completed within 6 months as this is a time bound activity.
4. Registration of deemed conveyance:
A deemed conveyance deed is created during this phase and is signed by both societies and developers. If developers do not appear for hearing in the prior stage (Which is the case in deemed conveyance), authorities have the power to sign the deed on behalf of developers.
The society needs to conduct a meeting and appoint 3 members to sign the deed. Post that the deed is submitted to district stamp office for adjudication. If all the members have paid their stamp duty and if there is no balance FSI, the office issues adjudication certificate. (Note – Deed only requires Rs 100 stamp duty). The adjudication certificate needs to be then franked from local bank and resubmitted to registration office.
The registration office then issues notice to land owner/developer to verify if there is any stay order against the deed of conveyance. (Note – The developer can get the stay order only from high court). If there is no stay order the deed of deemed conveyance is registered and then the office issues scanned documents and Index II. This mark end of registration process and the society becomes the owner of the land and structure.
5. Transfer of property:
In this phase a new application is submitted to various departments to make mutation entries in their records. This would make the process complete.

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 8th, 2018|Uncategorized|Comments Off on Advocates for Deemed Conveyance Process in Pune

FORMATION / REGISTRATION OF CO-OPERATIVE HOUSING SOCIETIES IN PUNE

According to the Law, every Builder / Developer has to form a Housing Co-operative Society with limited options available in this regard to managing the affairs of the building i.e.
(a) Condominium
(b) Private Limited Company and
(c) Co-operative Society, (excluding the unrealistic rental housing),
It wouldn’t be an exaggeration to state that in at least 90% the Promoters and / or the Builders have formed a Housing Co-operative Society.
The basic requirements for a Co-operative Housing Society Registration normally are unknown to the flat/unit purchasers. It is the statutory obligation cast upon the builder, where the builder acts as a friend, philosopher, and guide of the promoters and helps them in forming a Co- operative Housing Society.
There are four types of Housing Co-operative Societies
(a) Open Plot type Societies [Tenant ownership]
(b) Flat Owners Societies [Tenant Co-partnership]
(c) Tenant Societies
(d) Housing Board Societies.
The procedure for Co-operative Housing Society Registration begins with electing a Chief Promoter in a meeting of the Promoters. The builder under the Flat Owners type of co-operative society has the first right to act as the chief promoter. The developer / flat purchasers should call for a meeting of the Promoters by issuing the notice under Agenda of the meeting given at least 14 days notice to the Promoters. In this meeting, a Chief Promoter is elected who can exercise such powers and carry out such functions as are mentioned in the minutes of the Promoters of the proposed Co-operative Society. After electing the Chief Promoter, the proposed name of the society has to be decided by the Promoters. Normally, the name reservation proposal should be accompanied by the signature of at least 10 Promoters who have attended the meeting. It is a common belief that the Society should consist of at least 10 members. If the number is less than 10 then special permission from Government has to be taken. In such cases, the garages/car parking may be allotted to other relatives of the promoter to reach a number of 10.
It would be of interest to note that the model bye-laws define flat as a Flat means a separate set and self-contained set of premises used or intended to be used or intended to be used for residence, or office or showroom, or shop, or godown and includes a garage, or dispensary, or consulting room, or clinic, or flour mill, the premises forming part of a building and includes an apartment. On allotment of name and permission to open a bank account by the Registrar, the Chief Promoter has to collect Share Capital, Entrance Fees from promoters and deposit the same in the branch of the bank permitted by the Registrar. It should be noted that the amount cannot be withdrawn from the Bank till the Society is Registered or its Registration is refused, except with prior written permission of the Registrar. The Chief Promoter should submit Registration Proposal to the Registering Authority within a period of 3 months from the date of issue of Letter of Reservation in the name of the proposed Society.
The documents that need to be submitted to the Registering Authorities for Housing Co-operative Society Registration are as under:
1. Application for registration of Housing Co-operative Society in Form A along with Statement A. Enclosure to application for Registration as per Rule 4(1) of Maharashtra Co-operative Societies Rules, 1961.
2. Information about proposed Housing Co-operative Society in Statement ‘B’ (vide Govt. Circular dated 2-5-1980).
3. Information about promoter members of the proposed Housing Co-operative Society in Statement ‘C’ (vide Govt. Circular dt. 2-5-1980).
4. A Statement of Accounts as per Form D.
5. Model Bye-laws.
6. Bank Balance Certificate.
7. S.B.I. / Treasury Challan for payment of Registration Fee of Rs. 2500
8. Title Clearance Certificate from an Advocate
9. A true copy of the approved Building Plan.
10. Letter of Authority Granting permission to commence construction work/Completion Certificate (if applicable).
11. Affidavit on Rs. 100/- Stamp Paper from at least 10 promoter members to the effect that they are residing in the area of operation of the Society (Proposed), made before a Competent Authority.
12. An affidavit from the Chief Promoter on Stamp Paper of Rs. 100/- executed before the Competent Authority in form ‘Y’.
13. Certified True Copy of an agreement made on Stamp paper and registered between the builder, promoter and purchasers of flat.
14. Where the promoter members are firms/ companies, a letter of authority from such firms/companies authorizing the promoter to sign on behalf of firm / company.
15. In the case of such proposed societies, names of 60% of the flat holders of the total number of flats constructed or proposed to be constructed as per the plan approved, must be included in Statement ‘A’ to be attached to the Registration Proposal. It is the duty of the Registrar to register the society and on registration of the society, it becomes a separate legal entity. Thereafter, the management of the affairs of the society is carried out by the managing committee which is elected by the general body meeting of the society. It may be of interest to note that in a co-operative society the principle is one member one vote. In a co-operative society, the right to be exercised in the general body meeting is a personal right. This is one of the reasons why even a person holding a power of attorney cannot attend the general body meeting of the society. The quantum of the capital being introduced by the member is not of much importance. Preference should be given to the formation of a private limited company if one member proposes to acquire the majority of flats in the building.

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 8th, 2018|Uncategorized|Comments Off on FORMATION / REGISTRATION OF CO-OPERATIVE HOUSING SOCIETIES IN PUNE

Advocates for Agreement to Sale

There are various ways through which you can transfer a property that you own. It could be by way of sale, Will or gift. A commonly used method, especially when transferring to a family member or friend, is executing a gift deed in favour of the recipient. Though no monetary transaction is involved, it is still necessary to register the gift deed to make the transfer valid.
1) At time of Sale of Immovable Property, we come across the market value of the property. What exactly is the meaning of market value of property?
It means the price which such property would have fetched if sold in open market on the date of execution of such Document or the consideration stated in the document whichever is higher. However the Stamp office uses Ready Reckoner for referring to prevalent value of the property.
Stamp Duty is paid on the Market Value of the property and not on the amount of consideration stated in the Document.
2) Why Stamp duty is required to be paid?
It is kind of Tax like Sales Tax or Income Tax. And it must be paid in full and on time to the government. When there is a delay in payment, penalties are imposed. If it is properly paid as per the approved rate and after ascertainment of market value of the property, then the instrument / document/ agreement is treated as duly stamped document which can be admitted as evidence in any lawful transaction or in the court. if they are not properly stamped, Court or the Competent Authority may impound the same or will not be accepted as evidence.

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 7th, 2018|Uncategorized|Comments Off on Advocates for Agreement to Sale

Advocates for register a new housing Society

ADVOCATES FOR REGISTRATION OF HOUSING SOCIETY:
A co-operative society is the perfect fit for a residential building as flat-owners have common needs (water connection, watchmen, etc) and interests (maintenance of common areas, such as the terrace and compound). If you’ve purchased a flat in a new building, it would probably be best if you took interest in forming a society. The builder may also be statutorily obligated to form a society. For example, under Maharashtra Flat Ownership Act, 1963, a builder must form a society within four months of selling 60% of the flats.
But you needn’t wait for the builder to form the society. In many states, including Delhi and Maharashtra, ten flat-owners are enough to promote a co-operative housing society. A building without a housing society usually indicates that there is a dispute between members or a general lack of interest. If you’re considering buying a house in a building where the society has not been formed, find out what the problem is. If the builder does not form a society, rights to the terrace and the compound continue to rest with him.
We, the “VED LEGAL” provide registration and formation services which help you at every step of society formation, right from inception to final handover. We look after all the legal complications involved in society formation and carry out necessary negotiations with developers.
We have also completed the registration process for various projects. We specialize in society formation of housing societies, commercial societies, maintenance societies and large townships. We help developers and societies with complex registration process during society mergers, society split, and federation registrations.
Our specialized services include:
• Initial screening
• Gap identification and ratification
• Process documentation and finalization
• Dispute resolution
• Society name reservation at respective co-operative departments
• Account formation and legal documentation

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 7th, 2018|Uncategorized|Comments Off on Advocates for register a new housing Society

Deemed Conveyance Process in Pune

A COMPLETE GUIDE TO DEEMED CONVEYANCE

Most of the flat-owners of the newly constructed Societies/apartments do not have their sale deeds or conveyance deeds. Mostly in the newly constructed buildings, the builders provide for forming a housing co-operative society to which they shall transfer their interest in the property. Then the builders form the society but do not transfer the title of the property (read ownership) to the flat-owners or the society till he has transferred all the rights in the building/ Societies/apartments. Thus the builders/promoters are benefiting from the buyers lack of awareness and information.
To curb this practice, amendments were carried out in the Maharashtra Ownership Flats Act, 1963, in 2008 to appoint a Competent Authority (Registrar of Co-operative Housing Societies) to hear the grievances of such Societies/apartments owners and to safeguard their interest by executing deemed conveyance of such societies u/s 11(3) of Maharashtra Ownership Flats Act, 1963.
Ved Legal is having enough experience to deal with these kinds of Deemed Conveyance of Co-operative Housing Societies, in and around pune. Any aggrieved society or apartment holder can get resolution from us in regards of the same.
MEANING OF CONVEYANCE:
Conveyance means to transfer or convey anything to another person. In the legal sense Conveyance refers to the transfer of ownership or other interest in the property to the other party. Conveyance Deed is a document executed to transfer the title of land and building in favour of Society or Association of Persons (AOP).

MEANING OF DEEMED CONVEYANCE:
A deemed conveyance means when the builder/ promoter/ developer of the project refuses to sign the conveyance deed the court can sign the same on behalf of the builder and record the same in the government records.

NEED FOR DEEMED CONVEYANCE:
In a situation when a promoter or owner of residential premises/ buildings does not transfer/convey the ownership of the flats to the housing society or association of persons (AOP), the society or AOP can make an application to Registrar of Co-operative Housing Societies, to transfer the ownership of the said flats to them. This process is carried on through Deemed Conveyance of the title of the buildings and land in favour of the Society or AOP without the need of the builder to do so.

IMPORTANCE AND PROVISION OF LAW ON CONVEYANCE:
As per the Housing Society bye-laws, the main objective of formation of the Society is to obtain the Conveyance; and if Conveyance is not given by the Builder within four months from the date of registration of the Society, a case can be filed against the Builder to obtain the Conveyance. As per Section 13 of Maharashtra Ownership Flats Act, 1963, failure to give Conveyance is an offence and the Builder can be imprisoned up to 3 years or fined or both.

ADVANTAGES OF CONVEYANCE:
1. Getting a proper and legal title in the name of the Society.
2. Retaining the additional FSI as per the Government announcements.
3. Property will be free and marketable.
4. Society can raise the loans for repairs and reconstruction by mortgage.
5. Permission from planning authorities is possible if the building has to be reconstructed at a later date due to dilapidation of the structure due to age or by earthquake.
6. Society can take the benefit of TDR.
7. Members can receive compensation from Builder on redevelopment of the building.
DISADVANTAGES OF NOT HAVING CONVEYANCE DEED
Even though you have purchased ownership flat, you are not the owner of the land and building. 2. In the event of a building collapse or damage to the building, you cannot reconstruct the building without the permission of the Builder / Land owner.
1. The Builder/Developer may mortgage the property purchased by you as he is the legal owner and holding the Title Deeds of the Property.
2. The Builder/Developer may tap the benefits in case the building is later taken up for redevelopment or if the plot has some unutilized floor space index.
3. The Builder may make profit by sale of open spaces, gardens, terrace, parking space belonging to the Society.
4. The Builder may demand a huge amount from the Society, if Conveyance is sought by the Society after a lapse of many years.
5. The Builder may sell the entire Development Rights and the Legal Rights on the land to third party and create a third party interest in the Property and the Society will have to incur a huge amount to clear the same.
CONDITIONS PRECEDENT FOR GETTING A DEEMED CONVEYANCE:
There are certain important conditions which need to be fulfilled to go ahead for deemed conveyance, some of them are:

1. At least 60% of the flats in that scheme should be sold.
2. A Co-operative Society or Association of Persons should have been formed of the flat-owners and at least 3-4 months should have been passed since then.
3. There should be communication between the builder and the society or AOP regarding Deemed Conveyance wherein the builder should have made a promise of completion of conveyance or refused to do the same.

PROCEDURE FOR FILING AN APPLICATION FOR DEEMED CONVEYANCE:
After the above mentioned conditions are fulfilled, the following steps shall be taken:
Write a letter /email to builder/ promoter requesting him to provide a draft of the SALE DEED/ CONVEYANCE DEED or providing the draft to him and requesting him to sign the same.
• If the Builder rejects or postpones the same, send him a legal notice through an advocate requesting for the same.
• Even then if the builder refuses, File an application with the Registrar of Co-operative Societies together with all the relevant documents and 2000 Rs. Court stamp fees.
• Self-attestation all the copies enclosed (by the society)
• The Competent Authority will assess the application and if any documents are missing he will ask the applicant to correct the mistake within fifteen days.
• Thereafter, notice would be sent to the promoter and the land owners.
• After receipt of the notice by the land owners and the promoters, the authority will hear both parties in the first hearing and ask both parties to produce further evidences in next hearing.
• Thereafter, second hearing would be held and if the builder or landowners do not attend both first and second hearing then the authority will pass an exparte order.
• Thereafter, the third and final hearing would be held and the authority would be held and order would be passed unless a legal question is raised.
• Normally the whole process is completed within a period of 6 months.
DOCUMENTS REQUIRED:
Further, the application required to be made with the Registrar shall be accompanied by copies of certain 20 odd documents which the society shall have to prepare or get prepared.

The papers required for doing Deemed Conveyance are as follows:
o Application Form 7 to the District Deputy Registrar, Co-operative Societies, affixing a court fee stamp of Rs 2,000 on the application
o Affidavit made before the Notary or Executive Magistrate True copy of the Society Registration Certificate
o Stamp duty paid and registered agreement copy of 1 individual flats/ shops with Builder/Developer
o List of members in prescribed format
o Index-II for each member as issued by the Sub-Registrar of Assurance
o Copy of the Development Agreement between land owner and builder
o Copy of the Power of Attorney between land owner and builder
o Copy of the legal notice issued to the original owner or developer for doing conveyance
o Details of corresponding address telephone number etc. of the original owner or developer
o Draft conveyance deed/ Declaration proposed to be executed in favour of the applicant

Documents to be obtained from City Survey Office, for submission:
o City (CTS) Survey plan
o Property Registration Card or
o 7/12 extract of the land
o Village form 6 (Mutation entries from Revenue Office)

Documents to be obtained from the Collector’s Office, for submission:
o Copy of the Non-Agricultural Order
o Certificate of the exclusion from Land Ceiling Act (ULC) Certificate

Documents to be obtained from the concerned Municipal Authority Office, for submission:
o Copy of the approved plan
o IOD
o Commencement Certificate
o Building Completion certificate
o Occupation Certificate (not compulsory)
o Property taxes paid
o Location plan of the building

Documents to be obtained from other professionals, for submission:
o Search Report of the land issued by the Solicitor/Advocate
o Title Certificate of the Property issued by the Solicitor/Advocate (Search by minimum for last 30 years)
o Land Measurement Map/ Architect’s Certificate (layout plan of the plot)
o Certified copy from Panel Architect about the utilization of full FSI or FSI if any left in respect of the said property /Plot.
After, the Application is heard by the Registrar he may grant an order for deemed conveyance which shall then be produced before a court for execution and hence the conveyance may be done by a court order.
PROCEDURE:
Stage 1- Preparation for Deemed Conveyance
During this stage the Managing Committee prepares the Members of the Co- Operative Housing Society for Deemed Conveyance.
Stage 2- Documentation for Deemed Conveyance
During this stage the Documents Required for Deemed Conveyance are collected/ organized & the Case is prepared.
Stage 3- Legal Case for Deemed Conveyance
During this stage the case is filed before the Competent Authority & after contesting the same the Order & Certificate upholding the right of Deemed Conveyance of the Society is obtained.
Stage 4- Registration of Deemed Conveyance
During this stage the Deemed Conveyance Deed is Adjudicated, properly Stamped & Registered.
Stage 5- Transfer of Property after Deemed Conveyance
During this stage the Society Name is incorporated in the Land Revenue Records.
Let’s discuss each step in detail:

1. Preparation for Deemed Conveyance:
In this stage the managing committee needs to pass resolution to undergo deemed conveyance. A Special General Meeting is scheduled with prior notification and consent of all the members is obtained to move ahead.

During this SGM the following Resolutions are typically passed.
1. Resolution for going ahead with Deemed Conveyance
2. Resolution for Appointment of Authorized Representative
3. Resolution for Appointment of Legal Consultant for Deemed Conveyance
4. Resolution for Per Member Contributions
2. Documentation for Deemed Conveyance:
This is the most crucial step in obtaining deemed conveyance. It is a very meticulous job and make sure all the documents are lined up within the right format. You would require land revenue records, municipal corporation records, society records, property development records and professional certificates.
All these documents can be obtained from various departments such as Land revenue records from City Survey Office, Tahasildar/Talathi Office & District Collector Office, municipal corporation records from Building Proposal Department of the Municipal Corporation. Society records and certificates can be obtained from society offices and professionals.
Once all the documents are lined up, society needs to fill in Deemed Conveyance Application- Form VII and attached all the related documents. In case of deemed conveyance, a legal notice is sent to the developer for their consent. In regular conveyance procedures, since the developers or promoters are willingly providing the rights lot of documents can be easily recovered from them.
Once the form is filled up and all documents are annexed it is submitted to the Competent Authority- the District Deputy Registrar of Co- Operative Societies of the particular District.
3. Legal Case for deemed conveyance:
Once the application is submitted to the authorities they issue Deemed Conveyance Scrutiny Report- Form VIII within 1 month. Once the compliance is provided the authorities issues Summons & Newspaper Notices to the Land Owners & Property Developers for appearing for the hearing.
During the hearing process authorities take into consideration the arguments of the both parties. The process takes place within 3-4 months. Once all the arguments are documented the office issues a Deemed Conveyance order within 1 month. The whole process is completed within 6 months as this is a time bound activity.
4. Registration of deemed conveyance:
A deemed conveyance deed is created during this phase and is signed by both societies and developers. If developers do not appear for hearing in the prior stage (Which is the case in deemed conveyance), authorities have the power to sign the deed on behalf of developers.
The society needs to conduct a meeting and appoint 3 members to sign the deed. Post that the deed is submitted to district stamp office for adjudication. If all the members have paid their stamp duty and if there is no balance FSI, the office issues adjudication certificate. (Note – Deed only requires Rs 100 stamp duty). The adjudication certificate needs to be then franked from local bank and resubmitted to registration office.
The registration office then issues notice to land owner/developer to verify if there is any stay order against the deed of conveyance. (Note – The developer can get the stay order only from high court). If there is no stay order the deed of deemed conveyance is registered and then the office issues scanned documents and Index II. This mark end of registration process and the society becomes the owner of the land and structure.
5. Transfer of property:
In this phase a new application is submitted to various departments to make mutation entries in their records. This would make the process complete.

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |September 7th, 2018|Uncategorized|Comments Off on Deemed Conveyance Process in Pune

Advocates for RERA Registration In Pune

 Implications of RERA on buyers, builders, agents
1. Provisions applicable to both residential and commercial properties
2. Expected to bring in transparency and accountability in real estate sector
3. Each state to set up Real Estate Regulatory Authority to regulate real estate development
4. Standardization of norms to protect interests of buyers and developers
5. Aims to minimize rampant project delays and mis-selling

 Real Estate Regulatory Authority:-
RERA is an Act for regulation and promotion of the real estate sector to ensure the sale of apartment, plot or building in an efficient and transparent manner. The Act aims to protect the interest of consumers. It was enacted by the Parliament in May 2016 and the Act has come into force with all its 92 sections from 1st May, 2017 across India. So far, 14 states and union territories such as Uttar Pradesh, Gujarat, Bihar, Madhya Pradesh, Odisha, Andhra Pradesh and Maharashtra have notified their rules with RERA and the others are expected to follow suit.
The implementation of RERA is expected to bring relief to the homebuyers as builders will be accountable for the timely delivery of the projects and to protect buyers from fraud sellers. The developers would also gain from the increased confidence of the consumers in a regulated environment.
It is mandatory for the developers to get all approvals from various government agencies before launching a project and disclose all the information on the website that the respective state RERA regulatory authority will set up.
Real estate agents will be provided a registration number by the regulator which they have to mention in every property sale. This will help in eliminating the possibility of misleading the purchaser. The authority has wide ranging powers to impose penalties and imprisonment of agents in case of violation of law.
 Advantages of RERA for homebuyers
• Builders have to disclose every detail of the project on the website of authority and update these on a regular basis
• The buyer will have to pay only on the basis of carpet area (area within walls). The builder cannot charge them for the super built-up area (lift, balcony, stairs and lobby)
• Timely completion of projects as 70% of the money collected from the customer has to be transferred in a separate bank account and can be used only for the purpose of completing the construction of the project
• Any delay in completion of the project will require the developer to pay an interest rate of 2% above SBI’s Marginal cost of leading rate to the buyer for delayed period
• Any defect in the building will be the responsibility of builder for a period of 5 years
• Any disputes with the buyers need to be resolved within 120 days
 Provisions of RERA:-
1. RERA will be followed in every state of India and this regulation applies to both residential and commercial properties.
2. Builders are required to deposit 70% of the funds collected from buyers in a separate bank account for the construction of the project
3. Developers have to disclose the project details (financial statements, legal title deed and others) on the website and update it on quarterly basis related to the construction progress
4. The sale of property will be based on carpet area and not on super built-up area.
5. Builders require submitting the original approved plans for their project and the alterations made to RERA
6. Developers and buyers both have to pay the same interest rate of 2% above SBI’s MCLR in case of any delay.
7. Projects with plot size of minimum 500 sq. mt or 8 apartments need to be registered with the RERA Authority
8. Imprisonment of up to 3 years for the developers and up to 1 year for agents and buyers for violation of law
9. Developers are not allowed to advertise, sell, offer, market or book any plot or apartment without registering to the authority
10. Any structural or workmanship defects in the building during the period of 5 years must be rectified within 30 days by the promoter without any further charges. If he fails to do so, the buyer is entitled to receive the compensation under RERA
11. Developers cannot demand for more than 10% of the property cost as an advanced payment booking amount before signing a registered sale agreement

All commercial and residential projects will have to register except in projects where:-
• The area of land proposed to be developed does not exceed 500 sq. mt
• The number of apartments is not more than 8
• Any repair or renovation of an existing building or structure that does not require marketing, advertising and selling of any apartment or plot
 Registration process for Real Estate Agents
• Fill an application form along with fee and documents to get registered with RERA
• You will receive a registration number from the regulator. This need to be mentioned in every property sale
• On a quarterly basis, you are required to maintain the books of account, records and documents related to the transactions
• Share all the information and documents about the project with the buyer
• Agent may be suspended for the misrepresentation or fraud during the registration process

 Documents required for registration under RERA
Following documents should be enclosed in hardcopy with the application:-
• PAN Card of the builder.
• ITR of last 3 years and the balance sheet of the builder.
• Builder must clarify about the apartment (carpet area, number of floors, parking space)
• Declaration by the builder of having legal title of the land with proof
• Details of the land (rights, title, mortgage)
• If the builder is not the owner of the land, the consent letter of the actual owner with documents will be required.
• Details of the project (location, sanctioned plan, layout plan)
• Ownership documents (proforma of allotment letter, agreement of sale)
• Information of the persons involved (Architects, Engineers and others)
 Filling of complaints under RERA
• Any aggrieved person may file a complaint with RERA for any violation of the provisions of the Act.
• In case the person is not satisfied with the decision made by RERA or its officer, he may file an appeal before the RERA Appellate Tribunal within a period of 60 days
• From the date of decision made by Appellate Tribunal, person can file appeal to High Court within 60 days
 Penalties and Punishments under RERA

On Promoters / Builders
Offence Penalties / Punishment
Non registration of a project 10% of the estimated cost of real estate project
Violation of law Imprisonment for up to 3 years with or without fine for 10% of the estimated cost of project
Providing false information 5% of the estimated cost of project
Other contraventions 5% of the estimated cost of project

On Agents
Offence Penalties / Punishment
Non registration of a project Rs. 10,000 per day of default which may extend up to 5% of the cost of property
Failure to comply with Authority Penalty on a daily basis which may extend up to 5% of the estimated cost of plot
Failure to comply with Tribunal Imprisonment for up to 1 year with or without fine of 10% of the estimated cost of the project