DEEMED CONVEYANCE PROCEDURE FOR CHS BECOMES EASY

DEEMED CONVEYANCE PROCEDURE FOR CHS BECOMES HAS BECOME EASY

The Maharashtra government has relaxed the terms for the deemed conveyance (DC)-ownership right of plot certificate from the builder, by bringing down the number of documents required from 12 to 8 and stipulating that DC will be given even if the society does not have an Occupation Certificate (OC) or the Building Completion Certificate (CC).

It is mandatory for land-owners or developers to convey the title of the plot within four months of the formation of the housing society. In many cases, the builders fail to convey the title of properties to the housing societies, in the hope of availing more floor space index (FSI) that may become available in future, or to avail the benefits accrued to them in case the property is redeveloped.

If the builder fails to convey the property, the Maharashtra Ownership Flats Act (MOFA) allows societies to apply for DC. However, having OC was mandatory and was insisted upon by the officials of the cooperative registrar’s office. OC is given only when the building is complete in all respects and has complied with the mandatory norms laid down by the government authorities to make it ready for occupation. Since most of the builders abandon the projects before complying with the norms and conditions, OCs are not given to the societies. Developers just hand over the possession and exit the project, leaving the residents high and dry.

However now, the DC will be issued even if housing societies have submitted such documentary evidence as the formation of the society or the payment of property tax by the society.

As per the GR issued on 22 June 2018, by the state cooperation department, it has been made mandatory for the registrar of cooperative societies to register documents of the applicants within a day. Besides, as per the Maharashtra Right to Public Services Act, 2015, the DC should be issued within six months. If an official fails to provide and approve it within the prescribed period, then he or she will be penalized between Rs500 and Rs.5,000/-

The applicants should submit the applications with a court fee of Rs2,000. In case the FSI has already been consumed, a certificate of an architect that the total FSI has been consumed would suffice. In addition, they have to give an indemnity bond stating that they will take responsibility for the building and adhere to all required rules and regulations. If there are more than one society on one plot, the details of proportionate area and ground coverage should be furnished.

The documents required for conveyance include society registration certificate, approved layout, 7/12 extract, sale deed of each flat owner or heir document, list of registered members of the society, occupation certificate, non-agriculture certificate of that particular plot and notice copy etc. In the absence of sale deeds of all members, the sale deed of even one member would be sufficient, states the GR.

While submitting the conveyance application and documents to the registrar, a copy of the same application also needs to be submitted to the stamp duty and registration department for its speedy approval. The applications will be accepted online as well as offline. The officials of the concerned department such as urban, cooperative, forest and revenue department will have to work in unison so that the applicants are not required to shuttle from one department to another.

The system of issuing DC was started three years ago. However, due to stringent conditions there was no response from cooperative societies. Commenting on the issue, Ramesh Prabhu, Chairman, Maharashtra Societies Welfare Association said “This was a positive step. In many cases, the builders exited the project without getting the OC, and the residents had to bear the brunt. This relaxation will ensure that majority of the societies get deemed conveyance. By a fair estimate over 10,000 cooperative housing societies in Mumbai and neighboring areas, are yet to get the DC. Now they should come forward to take advantage of these relaxed norms.” There are a sizable number of housing societies in Mumbai that are struggling to get the DC. In absence of DC, redevelopment of some of the societies has been delayed. Some of the developers used to sell the flats till they held the ownership right of the layout and were misusing this right, causing impediment in the way of redevelopment.

By |June 5th, 2023|DEEMED CONVEYANCE PROCEDURE FOR HOUSING SOCIETY BECOMES EASY|Comments Off on DEEMED CONVEYANCE PROCEDURE FOR CHS BECOMES EASY

Advocate for Agreement and Sale Deed

Advocate for Agreement and Sale Deed

Want to purchase a Flat? If Yes, Please Be Careful so you may not fall prey to  the frivilious offers by deceitful builders and developers.

While purchasing the Flat Property you should take the following care/ due diligence.

  1. Prefer a ready to move property rather an under construction property.If property is ready to move see that if the project has any tie ups with nationalised banks, if so the project is safe to invest because bank offers assitance to a project or scheme, after due diligence.Or else first thing to do is,to get the title search done.If title is clear than go for bank loan, because banks while granting loan takes due diligence while lending financial assistance. This again will be a safety check for verification and authentication of builder as well as project, if there are any existing encumbrances on the said property.If the bank is ready to sanction loan means there is absence of encumbrances like mortgage or lease.
  2. The next comes in the checklist, is verification  with RERA.whether the builder/ scheme is registered with RERA, if so, confirm that he has not been blacklisted by the Authority.
  3. Another thing to take into account while considering ready to move property is whether the scheme has been assigned completion certificate and occupancy certificate which validates, that it is ready to move property.
  4. If it is under construction property before giving the token amount, check whether builder has got commencement certificate and other approvals from the  public authorities like MSEB,MUNICIPAL CORPORATION or N.O.C from environmental dept.as well as fire and safety department.

FOR MORE QUERIES PLEASE DO CONNECT WITH VEDLEGAL

MAIL ID – [email protected]CONTACT- +919763040088 

By |June 5th, 2023|Advocate for Agreement and Sale Deed in Mumbai|Comments Off on Advocate for Agreement and Sale Deed

PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

Amendments in Maharashtra Ownership Flats (Regulation of the promotion of construction, sale, management and transfer) Act, 2005 giving a huge relief to hundreds and thousands of flats purchasers in Maharashtra. Conveyance to the societies was a burning issues which have integrated many problems like property tax, housing finance documentations and major repairs or redevelopment.

The highlights of the amendments are as under:

  • Builder/s will have to execute the conveyance.
    Power is given to the District Deputy Registrar to act as Competent Authority. (Sec. 5A)
  • Power is given to Competent Authority for registration of Co-operative Society under the provisions of Maharashtra Co-operative Societies Act, 1960. (Sec. 10(1) )
  • It is the duty of the promoter (builder) to file with the Competent Authority within the prescribed period a copy of the conveyance executed by him (Sec. 11(2))
  • If the promoter fails to execute the conveyance in favour of Co-operative Society, Company or Associations or Apartment Owners as the case may be, then the flat purchasers can approach the Competent Authority with true copy of registered agreement of all the flat purchasers including Occupation Certificate, Registration Certificate of the society then in such circumstances the Co-operative Society, Company or Associations is entitled to have unilateral deemed conveyance (Sec. 11(3))
  • The proceedings before the Competent Authority have to be completed within a period of 6 months. The Competent Authority must verify the authenticity of the document produced before him and after giving a reasonable opportunity to the promoter, if satisfied will issue a certificate to the Sub-Registrar or any other Registration Officer under the Registration Act, 1908, certifying that it is a fit case for enforcing unilateral execution of conveyance deed conveying the right, title and interest of the promoter in the land and the building in favour of the applicant, as deemed conveyance(Sec. 11(4))
  • The sub registrar after receipt of the certificate issued by the Competent Authority along with the unilateral instrument of conveyance can issue summons to the promoter to show cause why the unilateral instrument should not be registered as deemed conveyance. However, reasonable opportunity of being heard may be given to the promoter. If the Sub-Registrar is satisfied then he will register the unilateral conveyance as ‘deemed conveyance’. (Sec. 11(5))
  • The Competent Authority has been created who has powers to award criminal imprisonment to the builder/s for a period not less than 6 months and not more than 1 year and / or along with fine ranging from Rs 10,000/- to 50,000/- (Sec. 13(3)(a) & 13(3)(b))
  • The builder/s if convicted will not be able to carry on construction activities for a period of five years. However, the disqualification shall not affect the permission for construction of flats already granted. (Sec. 13 (4), 13(5) & 13(6) )
  • The Competent Authority shall be deemed to be a public servant as per the provisions of Indian Penal Code. (Sec. (13B)
  • Proceedings before Competent Authority shall be aimed to be judicial proceedings as per the provisions of Indian Penal Code. (Sec. 13C)
  • Competent Authority shall be deemed to be a Civil Court for certain purposes. (Sec. 13D)

No action can be taken against the Competent Authority for acts done in good faith by the Competent Authority. (Sec. 13E)

By |June 3rd, 2023|PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA- 1963|Comments Off on PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

BEST CONVEYANCE SERVICES FOR SOCIETIES

BEST CONVEYANCE SERVICES FOR SOCIETIES:-

In most of the cases people believe that a Purchase Agreement is the final document they need to own. However, a mere purchase agreement does not pass on the developer’s rights on the land to the society. Societies need to make sure they have the complete right to the land, and mere society registration and formation does not provide those rights.

A Conveyance Deed helps societies to gain the right of their land. Post this builder relinquishes his legal right on the land.

We the “VED LEGAL” provide end-to-end conveyance services to the societies including execution of Conveyance Deed, Deemed Conveyance, and Deed of Apartments. We work closely with co-operative societies and government officials and make sure the complete process is hassle free.

With our team of legal advisers and professional approach, we have handled more than 100 cases across Pune. We guide our clients through the complete process of transferring builder’s rights, allocation of additional space and finally establishment of society rights, as per the law.

Our conveyance services include:                           

Apartment formation:                                                 

• Deed of Declaration • Deed of Apartment

Co-operative Societies Conveyance: • Conveyance deed with builder’s consent     • Deemed Conveyance – without builder’s consent

By |June 3rd, 2023|BEST CONVEYANCE SERVICES FOR SOCIETIES|Comments Off on BEST CONVEYANCE SERVICES FOR SOCIETIES

Advocate for Agreement and Sale Deed

 Advocate for Agreement and Sale Deed

Want to purchase a Flat? If Yes, Please Be Careful so you may not fall prey to  the frivilious offers by decietfull builders and developers.

While purchasing the Flat Property you should take the following care/ due diligence.

  1. Prefer a ready to move property rather an under construction property.If property is ready to move see that if the project has any tie ups with nationalised banks, if so the project is safe to invest because bank offers assitance to a project or scheme, after due diligence.Or else first thing to do is,to get the title search done.If title is clear than go for bank loan, because banks while granting loan takes due diligence while lending financial assistance. This again will be a safety check for verification and authentication of builder as well as project, if there are any existing encumbrances on the said property.If the bank is ready to sanction loan means there is absence of encumbrances like mortgage or lease.
  2. The next comes in the checklist, is verification  with RERA.whether the builder/ scheme is registered with RERA, if so, confirm that he has not been blacklisted by the Authority.
  3. Another thing to take into account while considering ready to move property is whether the scheme has been assigned completion certificate and occupancy certificate which validates, that it is ready to move property.
  4. If it is under construction property before giving the token amount, check whether builder has got commencement certificate and other approvals from the  public authorities like MSEB,MUNICIPAL CORPORATION or N.O.C from environmental dept.as well as fire and safety department.

FOR MORE QUERIES PLEASE DO CONNECT WITH VEDLEGAL

MAIL ID – [email protected]

CONTACT- +919763040088 

By |June 3rd, 2023|Advocate for Agreement and Sale Deed in Mumbai|Comments Off on Advocate for Agreement and Sale Deed

HANDOVER PROCESS WITH THE HELP OF BUILDER

HANDOVER PROCESS WITH THE HELP OF BUILDER

The date of handover from builder to the registered owners association is an important day for new apartment owners and all residents. It has to be taken seriously and detailed due diligence must be done when interacting with the builders during this handover process. Once the formal handover to the Owners Association is completed, the onus is on the association to run the affairs of the society and to ensure its smooth functioning. The association must be prepared for this day for 3+ months leading to this event.

It is recommended that owners collaboratively engage with the builder right from late construction stages that will help them to take-up this responsibility in future. The builders can also reach out to representatives from the owners group to assist in the selection of maintenance agency which prepares them for the handover process.

Based on our experience in interacting with various builders and associations, we have collated a check list that associations can use when in dialogue with the builder on the handover process:

1. Get approved building plan which includes block-wise and floor-wise details

2. Collect the Completion Certificate which ensures adherence of the approved plan

3. No Objection certificates from pollution, fire, water and electricity authorities

4. Hard copy and soft copy (in CD) of all approved engineering drawings; look for approval seal on the drawings

5. Registration and parent documents

6. Drainage, sewage, Fire protection and common area power layout drawings

7. Car parking layout drawings (with numbering)

8. Asset Inventory of all movable and immovable equipment purchased; numbered in order (list needs to be exhaustive)

9. Record of recent service history on key equipment’s like lifts, DG sets, STP and WTP

10. AMC and warranty details; Original bills of equipment purchased (motors, Sewage and Water Treatment Plant, Generators, Gym items like treadmill)

11. Lift license details and next renewal date

12. STP/WTP vendor details, plant layout, operation manual and drawings

13. Receipts of property, electricity and water payments paid

14. Handover of corpus amount to the association

15. Share recent expenses incurred on various maintenance activities and account heads; will assist to budget coming year (staff salaries, purchase of cleaning material, swimming pool maintenance etc)

16.Contract signed with maintenance agency; agreed SLAs

17. Insurance taken for assets and third party lift insurance

18. Audited account statement at the time of handover 19. Arrange for introductory meeting with important suppliers and vendors

By |June 2nd, 2023|HANDOVER PROCESS WITH THE HELP OF BUILDER / PROMOTER|Comments Off on HANDOVER PROCESS WITH THE HELP OF BUILDER

WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION?

WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION?

1.            The builder is interested in using the increased FSI which will be awarded by the govt. for that area at any time in future. If the ‘Society’ is formed, then upon the transfer and conveyance of land in favour of the Society, the increased FSI will be owned by the Society and the builder shall not have any right over it. But if it is an Apartment, then the builder owns that increased FSI and can use it anywhere. Thus, the builder will keep taking advantage of every increase in FSI throughout in the future.

2.            In an Apartment, the builder retains the ownership of the open spaces which are not included in the saleable area. Example – Terrace or any open parking/stairs space which is not included in the saleable area. But in case of Society, the builder cannot retain any right on any of these areas and has to hand over everything to the Society. The Maharashtra Apartment Ownership Act also provides for the ownership of an individual Apartment in a building and to make such Apartment heritable and transferable property.

3.            Bye-laws and Rules of ‘Society’ are binding on all the residents and nobody can act as per his/her whims. Hence, if the Society decides to ban any objectionable commercial activities in the flats such as noise-making music classes or using the flat for catering or courier activities etc or not to rent out to bachelors etc, then all the residents have to abide by it. But if it is an Apartment, then owners can violate the Apartment Rules and the Apartment Body can just file a case in the Civil Court. However, while the Society disputes are resolved in a separate Court i.e. Co-operative Court dealing with Society matters and hence they are fast resolved whereas, the Apartment matters have to be taken to the normal Civil Court and hence they typically take years and decades to resolve. 4.            When the building contemplates redevelopment after 25-30 years, the Society’s decision will be final and hence the Society members will have negotiation power with the builder at that time. But if in case of an Apartment, the consent of every Apartment-owner is required and hence it goes into an endless delay due to lack of a common decision acceptable to everybody. There are many instances in Mumbai wherein finally the dilapidated buildings had to be forcefully vacated by an eviction order from Court since they became unlivable. Thus, while the decisions are taken on a ‘majority’ basis in Society, the Apartment goes with rule of ‘Acceptable by Everybody’. So if the builder has retained even one flat in an Apartment, he will play a veto card in his favour at the time of redevelopment.

By |June 2nd, 2023|WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION|Comments Off on WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION?

SOCIETY REGISTRATION

SOCIETY REGISTRATION

 First general body meeting (before registration)

In this meeting under Society’s Model Bye-law 3(iii), the Chief Promoter (could be the builder) is primarily selected by the promoters, who are members co-signing the registration application before the Registering Authority, under Bye-law 3(xii).

In this meeting, necessary resolutions are passed like opening the account in a bank in the name of proposed society and for obtaining permission for reserving the name of the society. It is compulsory for SRA/ MHADA recognized societies, for the first meeting to be video-recorded.

Application for registration

Normally, the name reservation proposal should be accompanied with the society resolutions and signatures of at least 10 Promoters who have attended the meeting. On allotment of name and permission to open a bank account by the Registrar, the Chief Promoter has to collect Share Capital, Entrance Fees from promoters and deposit the same in the branch of the bank permitted by the Registrar. It should be noted that the amount cannot be withdrawn from the Bank till the society is registered or its registration is refused, except with prior written permission of the Registrar. The Chief Promoter should submit registration proposal to the registering authority within a period of 3 months from the date of issue of Letter of Reservation in the name of the proposed society.

If builder/ promoter is not co-operating in registering the Co-operative Housing Society, then in that case, the application for registration of society be submitted in Form 6 (Rule 12) before the District Deputy Registrar, who has been given power under section 10(1) of the Maharashtra Ownership Flats Act 1963. While submitting the said proposal, a Notarized Indemnity Bond of the members who applied for the registration of society on the stamp paper of Rs. 200 is required.

Documents required for Registration

  • 7/12 extract of the land or property card.
  • Certificate concerning non-agricultural land from the competent authority
  • The order of applicable or non-applicable of land ceiling Act
  • Construction layout duly approved by the competent authority
  • Letter of sanction for starting construction
  • Certificate regarding completion of construction work
  • Development Agreement if the land is taken for development
  • Letter of Power of Attorney of the land
  • Title search report of the land
  • The registered agreement of purchases of the flat with necessary stamp duty paid
  • Architect Certificate regarding construction
  • List of Members
  • Scheme of the Society
  • Application for reserving name
  • At least ten members are necessary for registration of society. On the other hand, the government has given permission subject to some conditions for the Housing society of fewer than 10 members by exercising powers. For registration proposal, the signature of sixty percent promoters, who participated in the registration proposal is necessary.
  • If the land is given by the government or undertaking agency of the government then its guarantee letter.
  • No objection certificates from the Charitable Commissioner if the land is of Trust.
  • Certificate of the competent authority regarding non-agricultural plot
  • While registering SRA/SRD and MHADA recognized Co-operative Housing Societies, it is obligatory to fulfill the necessary papers as per instructions are given by the authorities by their circulars in addition to above criterion.
  • Application for Registering Society (A form)
  • Table giving information of society (B Form)
  • Table giving details of the members (C Form)
  • Statement of Accounts of the Members (D Form)
  • Notarized Guarantee letter by the Chief Promoter of the society on the stamp Paper of Rs. 100/-
  • Notarized Guarantee letter by the Builder, Promoter on the Stamp Paper of Rs. 100/-
  • Affidavit of Members (Affidavit of Minimum 10 Promoters)
  • Two copies of bye-laws of the Society approved by the Commissioner, Co-operation and Registrar, Co-operative Societies and Maharashtra State, Pune
  • Proof of the bank balance of the promoter member (deposit of each share of Rs. 500 and admission fee of Rs. 100), after getting permission for reservation in the District Central Co-operative Bank
  • Challan of Rs. 2500/- deposited in the Government Treasury Registration fee for the Housing Society of the Backward class is Rs. 50/-

Approval by Registrar

It is the duty of the concerned Registrar to register the Co-operative Housing Society, by scrutinizing the proposal submitted after fulfillment of above mentioned documents, and shall make an arrangement of issuing certificate of registration society under Section 9(1) of the Maharashtra Co-operative Society Act 1960, and copy of the registered bye-law, memorandum regarding registration of society to the chief promoter. The order regarding registration of society should have been sent for publishing in government gazette to the Government Printing Press for appropriate action. It is necessary to take decision on the registration of the society within a period of two months from the date of the proposal of the society submitted to the Registrar.

If proposal of society registration is denied or no decision is taken within two months then it is necessary to send that proposal to the Divisional Joint Registrar, Co-operative Societies under Section 152 of the Maharashtra Co. operative societies Act, can be approached.

First General Body Meeting obligatory Agenda (after registration):

•        To elect a Chairman for the meeting

•        To admit persons to membership who have applied for membership of the society.

•        To elect a provisional Managing Committee

•        To receive and approve the statement of account as prepared by the Chief Promoter        of the society up to 14 days prior to the first general body meeting of the society.

•        To authorize the committee to secure conveyance of right title and interest in the              property in the name of the society from the promoter builder

•        To impose restrictions on raising loan amount from outside

•        To appoint internal auditor and to fix his remuneration

•        To authorize one of the members of the provisional committee to call the first    meeting of the provisional committee

•        To take decision about taking membership of District Housing Federation and other         institutions

•        To give power to one member of provisional management committee to call meeting     of the managing committee

•        To consider the matters raised by the member except these matters which are    necessary for giving advance notice with the permission of chairman and eleventh                hour matter and to make resolution in that regard.

By |June 2nd, 2023|Society Registration in Pune|Comments Off on SOCIETY REGISTRATION

Advocate for property transfer

Advocate for property transfer

 DUE DILIGENCE TO BE DONE WHILE PURCHASING A  PROPERTY

  1. First comes in the checklist is the Zone.Check it whether the property comes into the “R” OR NON-AGRICULTURE” zone because if the the property is in non residential or non agriculture zone like green zone etc.you may not get approvals from authorities like MC for commencement of construction or if you get permission for construction in other zone, than R zone, the  F.S.I granted for other zones is comparatively less.
  2. The second must thing to do is “TITLE SEARCH”.
  3. Title search is must to do, but not enough, to ensure the property is without encumbrances,then what?
  4. Then the most important thing to be done after the title search is PUBLIC NOTICE.Public notice is meant for inviting any objections or claims regarding the property,this will make you aware if the land owner is playing double and has sold the same plot to somebody else also and if within the desired period no objections/claims are raised, you can move on.
  5. Next if the Landowner is handing over immediate possession go for a  registered sale deed.
  6. If the Landowner has promised, future possession, its better to go with agreement to sale and the consideration to be paid in part and the payment should be done through the negotiable instrument like Cheque/D.D or bank transfer NEFT/RTGS .In no case you should go for Cash transaction, There are  likely chances of deciet or fraud in Cash transaction.
  7. After a registered sale deed get the mutation entry done.see that your name has been arrived on the property card.
  8. Above are the general precautions to be taken.

     FOR MORE DETAILS DO CONNECT WITH VEDLEGAL

MAIL ID – [email protected]

CONTACT- +919763040088 

By |June 1st, 2023|Advocate for property transfer in Thane|Comments Off on Advocate for property transfer

Lawyers for Sale Deed

Lawyers for Sale Deed

A Sale deed is an instrument which shows the transfer of title, rights, and ownership of a property from a owner/vendor/ seller to a buyer/purchaser

A sale deed is an essential document for both the parties which are registered in accordance with the Registration Act, 1908. It is signed and executed as mentioned in the agreement after both the parties agree with the terms & conditions thereof

In general, this instrument of sale deed must content  below-mentioned details-

  •  the full name & address, age & occupation of the parties involved.
  •  Gat/Survey/CTS Numbers, Areas of the property, correct address, dimensions of the property, construction details of the building etc…
  •  This includes a declaration from the seller that the property being transferred is free from every encumbrance, litigation, and charge. Also, the seller indemnifies the buyer from any pending charges in that regard. The seller should settle a pending loan taken with the concerned property as a mortgage, before proceeding with the sale. The buyer has every right to examine the related documents before registration.
  •  This is the price at which the deal is closed between the parties. This section should also mention the advance amount paid if there is any. The parties should explicitly agree on the dates of payment, the mode of payment, etc. The price and the details of the transactions made should be mentioned in both figures and numbers. The sale deed should also mention the receipts of the sale transaction.
  •  the deed should specifically mention the date of handover to and possession by the buyer.

General precautions before execution of sale deed

  • to ensure there are no encumbrances like lien, mortgage etc.