Conditions for Membership of housing societies

An individual / applicant who is eligible to the member and who has applied for membership of the society in the prescribed form, may be admitted as member by the committee on complying with the following conditions :-Applicant has fully tendered the value of at least ten shares of the society , along with his application for membership ;Applicant has paid the entrance fee of Rs. 100/-, along with the application of membership ;Applicant has submitted the application , as prescribed , of the particulars in regard to any house ,plot or flat owned by him or any of the members of his family , anywhere in the area of operation of the society . Applicant has submitted undertaking in the prescribed form to the effect that he shall use the flat for the purpose for which it was purchased by him ;Applicant has furnished an undertaking in the prescribed form, if he/ she has no independent source of income ;Applicant has submitted , along with the application for membership of the society , a certified copy of the agreement , duly stamped and registered entered into by him / her /them with the promoter builder or transferor under section 4 of the Maharashtra ownership flats act;Applicant has furnished such other undertakings / declarations, in the prescribed forms as are required under any law for the time being in force and such other information as is required under the bye-laws of the society along with the application for membership. In case of societies registered under the jurisdiction of special planning authority like CIDCO / MHADA / SRA / MMRDA etc. the applicant should be eligible person as per the provision of respective Act and the directives of the Govt./ the planning authorities , if any.
An individual , a firm , a company or a body corporate , registered under any law for the time being in force, who/which is eligible to be an associate member and who/which shall apply through member in the prescribed form such membership , along with the entrance fee of Rs.100/-, may be admitted as associate member by the committee.
A Firm, Company or any other body corporate , registered under any law for the time being in force , which is eligible to be a member of the society and has made an application for membership of the society in the prescribed form may be admitted as a member by the committee of the society on complying with the following conditions :-
i. Applicant has sent , along with application for membership of the society , a certified copy of the agreement duly stamped entered into by if , with the promoter ( Builder ) or transferor under section 4 of the ownership flats Act 1963 with certified copy of resolution of the firm or company as the case may , authorizing to sign the application .
ii. Applicant has paid , along with application for membership , full value of at least 10 shares and entrance fee of Rs. 100/-
iii. Applicant has complied with the conditions mentioned in the notifications issued by the state government, from time to time, under the second proviso to section 22 of the Act.
iv. Applicant has furnished the undertakings/declarations in the prescribed forms required under any law the time being in force along with the application for membership.
A Sublette , a licensee or a care-taker , or occupant who is eligible to be a nominal member and who shall apply through member for such membership in the prescribed form applicable along with entrance fee of Rs.100/- may be admitted as nominal member by the committee.
The procedure for disposal of application for membership of the society, as laid under the bye-law No. 65(a) to (g) shall be followed by the secretary under the committee of the society.

By |February 1st, 2020|Conditions for Membership of housing societies|Comments Off on Conditions for Membership of housing societies

(D)Restrictions on Rights of Associate and nominal members

No associate member shall have any rights or privileges of an active member except as provided under section 27(2) of the act and he fulfill the conditions of bye-law22 (a)
A nominal member shall have no rights such as member.

By |February 1st, 2020|Restrictions on Rights of Associate and nominal members|Comments Off on (D)Restrictions on Rights of Associate and nominal members

REGISTRATION OF CO-OPERATIVE HOUSING SOCIETIES IN PUNE

REGISTRATION OF CO-OPERATIVE HOUSING SOCIETIES IN PUNE

According to the Law, every Builder / Developer has to form a Housing Co-operative Society with limited options available in this regard to managing the affairs of the building i.e.
(a) Condominium
(b) Private Limited Company and
(c) Co-operative Society, (excluding the unrealistic rental housing),
It wouldn’t be an exaggeration to state that in at least 90% the Promoters and / or the Builders have formed a Housing Co-operative Society.
The basic requirements for a Co-operative Housing Society Registration normally are unknown to the flat/unit purchasers. It is the statutory obligation cast upon the builder, where the builder acts as a friend, philosopher, and guide of the promoters and helps them in forming a Co- operative Housing Society.
There are four types of Housing Co-operative Societies
(a) Open Plot type Societies [Tenant ownership]
(b) Flat Owners Societies [Tenant Co-partnership]
(c) Tenant Societies
(d) Housing Board Societies.
The procedure for Co-operative Housing Society Registration begins with electing a Chief Promoter in a meeting of the Promoters. The builder under the Flat Owners type of co-operative society has the first right to act as the chief promoter. The developer / flat purchasers should call for a meeting of the Promoters by issuing the notice under Agenda of the meeting given at least 14 days notice to the Promoters. In this meeting, a Chief Promoter is elected who can exercise such powers and carry out such functions as are mentioned in the minutes of the Promoters of the proposed Co-operative Society. After electing the Chief Promoter, the proposed name of the society has to be decided by the Promoters. Normally, the name reservation proposal should be accompanied by the signature of at least 10 Promoters who have attended the meeting. It is a common belief that the Society should consist of at least 10 members. If the number is less than 10 then special permission from Government has to be taken. In such cases, the garages/car parking may be allotted to other relatives of the promoter to reach a number of 10.
It would be of interest to note that the model bye-laws define flat as a Flat means a separate set and self-contained set of premises used or intended to be used or intended to be used for residence, or office or showroom, or shop, or godown and includes a garage, or dispensary, or consulting room, or clinic, or flour mill, the premises forming part of a building and includes an apartment. On allotment of name and permission to open a bank account by the Registrar, the Chief Promoter has to collect Share Capital, Entrance Fees from promoters and deposit the same in the branch of the bank permitted by the Registrar. It should be noted that the amount cannot be withdrawn from the Bank till the Society is Registered or its Registration is refused, except with prior written permission of the Registrar. The Chief Promoter should submit Registration Proposal to the Registering Authority within a period of 3 months from the date of issue of Letter of Reservation in the name of the proposed Society.
The documents that need to be submitted to the Registering Authorities for Housing Co-operative Society Registration are as under:
1. Application for registration of Housing Co-operative Society in Form A along with Statement A. Enclosure to application for Registration as per Rule 4(1) of Maharashtra Co-operative Societies Rules, 1961.
2. Information about proposed Housing Co-operative Society in Statement ‘B’ (vide Govt. Circular dated 2-5-1980).
3. Information about promoter members of the proposed Housing Co-operative Society in Statement ‘C’ (vide Govt. Circular dt. 2-5-1980).
4. A Statement of Accounts as per Form D.
5. Model Bye-laws.
6. Bank Balance Certificate.
7. S.B.I. / Treasury Challan for payment of Registration Fee of Rs. 2500
8. Title Clearance Certificate from an Advocate
9. A true copy of the approved Building Plan.
10. Letter of Authority Granting permission to commence construction work/Completion Certificate (if applicable).
11. Affidavit on Rs. 100/- Stamp Paper from at least 10 promoter members to the effect that they are residing in the area of operation of the Society (Proposed), made before a Competent Authority.
12. An affidavit from the Chief Promoter on Stamp Paper of Rs. 100/- executed before the Competent Authority in form ‘Y’.
13. Certified True Copy of an agreement made on Stamp paper and registered between the builder, promoter and purchasers of flat.
14. Where the promoter members are firms/ companies, a letter of authority from such firms/companies authorizing the promoter to sign on behalf of firm / company.
15. In the case of such proposed societies, names of 60% of the flat holders of the total number of flats constructed or proposed to be constructed as per the plan approved, must be included in Statement ‘A’ to be attached to the Registration Proposal. It is the duty of the Registrar to register the society and on registration of the society; it becomes a separate legal entity. Thereafter, the management of the affairs of the society is carried out by the managing committee which is elected by the general body meeting of the society. It may be of interest to note that in a co-operative society the principle is one member one vote. In a co-operative society, the right to be exercised in the general body meeting is a personal right. This is one of the reasons why even a person holding a power of attorney cannot attend the general body meeting of the society. The quantum of the capital being introduced by the member is not of much importance. Preference should be given to the formation of a private limited company if one member proposes to acquire the majority of flats in the building.

By |February 1st, 2020|REGISTRATION OF CO-OPERATIVE HOUSING SOCIETIES IN PUNE|Comments Off on REGISTRATION OF CO-OPERATIVE HOUSING SOCIETIES IN PUNE

CONVEYANCE SERVICES FOR SOCIETIES MUMBAI

CONVEYANCE SERVICES FOR SOCIETIES MUMBAI:-

In most of the cases people believe that a Purchase Agreement is the final document they need to own. However, a mere purchase agreement does not pass on the developer’s rights on the land to the society. Societies need to make sure they have the complete right to the land, and mere society registration and formation does not provide those rights.
A Conveyance Deed helps societies to gain the right of their land. Post this builder relinquishes his legal right on the land.
We the “VED LEGAL” provide end-to-end conveyance services to the societies including execution of Conveyance Deed, Deemed Conveyance, and Deed of Apartments. We work closely with co-operative societies and government officials and make sure the complete process is hassle free.
With our team of legal advisers and professional approach, we have handled more than 100 cases across Pune. We guide our clients through the complete process of transferring builder’s rights, allocation of additional space and finally establishment of society rights, as per the law.
Our conveyance services include:
Apartment formation:
• Deed of Declaration • Deed of Apartment
Co-operative Societies Conveyance:
• Conveyance deed with builder’s consent • Deemed Conveyance – without builder’s consent

By |February 1st, 2020|CONVEYANCE SERVICES FOR SOCIETIES IN MUMBAI|Comments Off on CONVEYANCE SERVICES FOR SOCIETIES MUMBAI

Advocates for Deemed Conveyance Process in Pune

Advocates for Deemed Conveyance Process in Pune

Most of the flat-owners of the newly constructed Societies/apartments do not have their sale deeds or conveyance deeds. Mostly in the newly constructed buildings, the builders provide for forming a housing co-operative society to which they shall transfer their interest in the property. Then the builders form the society but do not transfer the title of the property (read ownership) to the flat-owners or the society till he has transferred all the rights in the building/Societies/apartments. Thus the builders/promoters are benefiting from the buyers lack of awareness and information.
To curb this practice, amendments were carried out in the Maharashtra Ownership Flats Act, 1963, in 2008 to appoint a Competent Authority (Registrar of Co-operative Housing Societies) to hear the grievances of such Societies/apartments owners and to safeguard their interest by executing deemed conveyance of such societies u/s 11(3) of Maharashtra Ownership Flats Act, 1963.
Ved Legal is having enough experience to deal with these kinds of Deemed Conveyance of Co-operative Housing Societies, in and around Mumbai, Pune. Any aggrieved society or apartment holder can get resolution from us in regards of the same.
CONVEYANCE AND ITS SIGNIFICANCE
Conveyance is transfer the title of land and building by promoter/land owner in favour of housing society by execution of Conveyance Deed. As per the provision contemplated in Section 11 of Maharashtra Ownership Flat Act 1963, Conveyance is the right of Co-operative Housing Society and the Duty of the property Developer/Promoter to be executed within 4 months from date of Registration of Co-Operative Society.
After land and Building is conveyed in favour of Co-Operative Society and the title of property is fully and finally recorded in the property card and other revenue records then only the property becomes completely free and marketable.
As per Housing Society Bye-laws the main objective of formation of the society is to obtain conveyance and if conveyance is executed within 4 months from date of registration of society case can be filed against the promoter /landowner of the land to obtain the conveyance as per section 13 of MOFA 1963 failure to give conveyance is an offence and the promoter/landowner of land can be imprisoned upto 3 years or fine or both.

MEANING OF DEEMED CONVEYANCE:
Deemed Conveyance occurs when the builder/land owner or the legal heir refuse to co-operate in handing over conveyance to the Co-operative Society under the Section 11(3) of Maharashtra Ownership Flats Act, 1963. In such case, the housing society has to appear before the District Deputy Registrar, who will hear the case of both parties i.e. the housing society and the builder and would pass the required order of Conveyance. It is a remedial measure obtained by the society against the builder/landowner who does not wish to convey the property since he/she sees a commercial gain out of the property in future. This could include usage of potential FSI for their personal gain.

Deemed Conveyance is final conveyance and the same can be registered. Once the designated Competent Authority has passed the order, there cannot be an appeal against it.

NEED FOR DEEMED CONVEYANCE:
In a situation when a promoter or owner of residential premises/ buildings does not transfer/convey the ownership of the flats to the housing society or association of persons (AOP), the society or AOP can make an application to Registrar of Co-operative Housing Societies, to transfer the ownership of the said flats to them. This process is carried on through Deemed Conveyance of the title of the buildings and land in favour of the Society or AOP without the need of the builder to do so.

IMPORTANCE & PROVISIONS OF LAW ON CONVEYANCE:
As per the Housing Society bye-laws, the main objective of formation of the Society is to obtain the Conveyance; and if Conveyance is not given by the Builder within four months from the date of registration of the Society, Case of Deemed Conveyance can be filed against the Builder to obtain the Conveyance before the District Deputy Registrar. As per Section 13 of Maharashtra Ownership Flats Act, 1963, failure to give Conveyance in favour of cooperative housing society is an offence and the Builder can be imprisoned up to 3 years or fined or both.

ADVANTAGES OF CONVEYANCE:
1. Getting a proper and legal title in the name of the Society.
2. Retaining the additional FSI as per the Government announcements.
3. Property will be free and marketable.
4. Society can raise the loans for repairs and reconstruction by mortgage.
5. Permission from planning authorities is possible if the building has to be reconstructed at a later date due to dilapidation of the structure due to age or by earthquake.
6. Society can take the benefit of TDR.
7. Members can receive compensation from Builder on redevelopment of the building.
DISADVANTAGES OF NOT HAVING CONVEYANCE DEED
Even though you have purchased ownership flat, you are not the owner of the land and building. 2. In the event of a building collapse or damage to the building, you cannot reconstruct the building without the permission of the Builder / Land owner.
1. The Builder/Developer may mortgage the property purchased by you as he is the legal owner and holding the Title Deeds of the Property.
2. The Builder/Developer may tap the benefits in case the building is later taken up for redevelopment or if the plot has some unutilized floor space index.
3. The Builder may make profit by sale of open spaces, gardens, terrace, parking space belonging to the Society.
4. The Builder may demand a huge amount from the Society, if Conveyance is sought by the Society after a lapse of many years.
5. The Builder may sell the entire Development Rights and the Legal Rights on the land to third party and create a third party interest in the Property and the Society will have to incur a huge amount to clear the same.
CONDITIONS PRECEDENT FOR GETTING A DEEMED CONVEYANCE:
There are certain important conditions which need to be fulfilled to go ahead for deemed conveyance, some of them are:

1. At least 60% of the flats in that scheme should be sold.
2. A Co-operative Society or Association of Persons should have been formed of the flat-owners and at least 3-4 months should have been passed since then.
3. There should be communication between the builder and the society or AOP regarding Deemed Conveyance wherein the builder should have made a promise of completion of conveyance or refused to do the same.
4 . A Resolution must be passed

PROCEDURE FOR FILING AN APPLICATION FOR DEEMED CONVEYANCE:
After the above mentioned conditions are fulfilled, the following steps shall be taken:
Write a letter /email to builder/ promoter requesting him to provide a draft of the SALE DEED/ CONVEYANCE DEED or providing the draft to him and requesting him to sign the same.
• If the Builder rejects or postpones the same, send him a legal notice through an advocate requesting for the same.
• Even then if the builder refuses, File an application with the Registrar of Co-operative Societies together with all the relevant documents and 2000 Rs. Court stamp fees.
• Self-attestation all the copies enclosed (by the society)
• The Competent Authority will assess the application and if any documents are missing he will ask the applicant to correct the mistake within fifteen days.
• Thereafter, notice would be sent to the promoter and the land owners.
• After receipt of the notice by the land owners and the promoters, the authority will hear both parties in the first hearing and ask both parties to produce further evidences in next hearing.
• Thereafter, second hearing would be held and if the builder or landowners do not attend both first and second hearing then the authority will pass an exparte order.
• Thereafter, the third and final hearing would be held and the authority would be held and order would be passed unless a legal question is raised.
• Normally the whole process is completed within a period of 6 months.
DOCUMENTS REQUIRED:
Further, the application required to be made with the Registrar shall be accompanied by copies of certain 20 odd documents which the society shall have to prepare or get prepared.

The papers required for doing Deemed Conveyance are as follows:
o Application Form 7 to the District Deputy Registrar, Co-operative Societies, affixing a court fee stamp of Rs 2,000 on the application
o Affidavit made before the Notary or Executive Magistrate True copy of the Society Registration Certificate
o Stamp duty paid and registered agreement copy of 1 individual flats/ shops with Builder/Developer
o List of members in prescribed format
o Index-II for each member as issued by the Sub-Registrar of Assurance
o Copy of the Development Agreement between land owner and builder
o Copy of the Power of Attorney between land owner and builder
o Copy of the legal notice issued to the original owner or developer for doing conveyance
o Details of corresponding address telephone number etc. of the original owner or developer
o Draft conveyance deed/ Declaration proposed to be executed in favour of the applicant

Documents to be obtained from City Survey Office, for submission:
o City (CTS) Survey Plan
o Property Registration Card or
o 7/12 extract of the Land
o Village form 6 (Mutation entries from Revenue Office)

Documents to be obtained from the Collector’s Office, for submission:
o Copy of the Non-Agricultural Order
o Certificate of the exclusion from Land Ceiling Act (ULC) Certificate

Documents to be obtained from the concerned Municipal Authority Office, for submission:
o Copy of the approved plan
o IOD
o Commencement Certificate
o Building Completion Certificate
o Occupation Certificate (not compulsory)
o Property taxes paid
o Location plan of the building

Documents to be obtained from other professionals, for submission:
o Search Report of the land issued by the Solicitor/Advocate
o Title Certificate of the Property issued by the Solicitor/Advocate (Search by minimum for last 30 years)
o Land Measurement Map/ Architect’s Certificate (layout plan of the plot)
o Certified copy from Panel Architect about the utilization of full FSI or FSI if any left in respect of the said property /Plot.
After, the Application is heard by the Registrar he may grant an order for deemed conveyance which shall then be produced before a court for execution and hence the conveyance may be done by a court order.
PROCEDURE:
Stage 1- Preparation for Deemed Conveyance
During this stage the Managing Committee prepares the Members of the Co- Operative Housing Society for Deemed Conveyance.
Stage 2- Documentation for Deemed Conveyance
During this stage the Documents Required for Deemed Conveyance are collected/ organized & the Case is prepared.
Stage 3- Legal Case for Deemed Conveyance
During this stage the case is filed before the Competent Authority & after contesting the same the Order & Certificate upholding the right of Deemed Conveyance of the Society is obtained.
Stage 4- Registration of Deemed Conveyance
During this stage the Deemed Conveyance Deed is Adjudicated, properly Stamped & Registered.
Stage 5- Transfer of Property after Deemed Conveyance
During this stage the Society Name is incorporated in the Land Revenue Records.
Let’s discuss each step in detail:

1. Preparation for Deemed Conveyance:
This is a very important stage where the Managing Committee prepares the Members of Co- Operative Housing Society for the Deemed Conveyance.
The Managing Committee convenes a Special General Meeting (SGM) of the Society by giving suitable notice highlighting the agenda.
The Managing Committee places before the SGM the difficulties faced for obtaining the Conveyance from the Land Owners/ Property Developers. The Managing Committee explains the effects of non- availability of Conveyance to the Members. The Managing Committee explains the Procedure & Benefits of Deemed Conveyance to the Members.
During this SGM the following Resolutions are typically passed.
1. Resolution for going ahead with Deemed Conveyance
2. Resolution for Appointment of Authorized Representative
3. Resolution for Appointment of Legal Consultant for Deemed Conveyance
4. Resolution for Per Member Contributions
2. Documentation for Deemed Conveyance:
This is the most crucial step in obtaining deemed conveyance. It is a very meticulous job and make sure all the documents are lined up within the right format. You would require land revenue records, municipal corporation records, society records, property development records and professional certificates.
All these documents can be obtained from various departments such as Land revenue records from City Survey Office, Tahasildar/Talathi Office & District Collector Office, municipal corporation records from Building Proposal Department of the Municipal Corporation. Society records and certificates can be obtained from society offices and professionals.
Once all the documents are lined up, society needs to fill in Deemed Conveyance Application- Form VII and attached all the related documents. In case of deemed conveyance, a legal notice is sent to the developer for their consent. In regular conveyance procedures, since the developers or promoters are willingly providing the rights lot of documents can be easily recovered from them.
Once the form is filled up and all documents are annexed it is submitted to the Competent Authority- the District Deputy Registrar of Co- Operative Societies of the particular District.
3. Legal Case for deemed conveyance:
Once the application is submitted to the authorities they issue Deemed Conveyance Scrutiny Report- Form VIII within 1 month. Once the compliance is provided the authorities issues Summons & Newspaper Notices to the Land Owners & Property Developers for appearing for the hearing.
During the hearing process authorities take into consideration the arguments of the both parties. The process takes place within 3-4 months. Once all the arguments are documented the office issues a Deemed Conveyance order within 1 month. The whole process is completed within 6 months as this is a time bound activity.
4. Registration of deemed conveyance:
A deemed conveyance deed is created during this phase and is signed by both societies and developers. If developers do not appear for hearing in the prior stage (Which is the case in deemed conveyance), authorities have the power to sign the deed on behalf of developers.
The society needs to conduct a meeting and appoint 3 members to sign the deed. Post that the deed is submitted to district stamp office for adjudication. If all the members have paid their stamp duty and if there is no balance FSI, the office issues adjudication certificate. (Note – Deed only requires Rs 100 stamp duty). The adjudication certificate needs to be then franked from local bank and resubmitted to registration office.
The registration office then issues notice to land owner/developer to verify if there is any stay order against the deed of conveyance. (Note – The developer can get the stay order only from high court). If there is no stay order the deed of deemed conveyance is registered and then the office issues scanned documents and Index II. This mark end of registration process and the society becomes the owner of the land and structure.
5. Transfer of property:
In this phase a new application is submitted to various departments to make mutation entries in their records. This would make the process complete.