DIFFERENCE BETWEEN CONVEYANCE AND DEEMED CONVEYANCE

DIFFERENCE BETWEEN CONVEYANCE AND DEEMED CONVEYANCE

Conveyance –
A generic term for any written document which transfers (conveys) real estate property or real property interests from one party to another.
So by the above definition its very clear that if someone willingly transfers their legal right of the property to another party they would need to create a document which transfers this right. Such a document is called Deed of conveyance.
The important point here is – Willingly. Now in case of housing societies the builder/promoters have to ideally create deed of conveyance and hand over it to housing societies that to within 4 months after project completion. However, due to lack of knowledge many builders do not create such documents. There have been cases where builders have later on denied to create such documents and asked additional money to provide signatures on these documents. You will find all sorts of reasons for not creating the document. This results in issues for societies in future. Therefore, government has amended the Maharashtra Ownership Flats Act, 1963 (MOFA) to make sure if builders run way from such responsibilities the societies do not suffer. This amendment is called Deemed Conveyance. This amendment allows society owners to gain the legal rights of the land even if the builder is not willing to transfer the rights, in front of designated competent authority.

Deemed Conveyance –
The Promoter (Builder/ Developer) is legally required to convey the land and the building within 4 months of formation to the society or any legal body of the flat purchasers. However, it has been the experience that many promoters (Builders/Developers) have not conveyed the land and building to the legal bodies. Therefore, government has amended the Maharashtra Ownership Flats Act, 1963 (MOFA) and provided for the deemed conveyance in favor of the legal bodies. Under the provision, deemed conveyance means after the expiry of 4 months of formation of the legal body, the land and building is deemed to have been conveyed to the legal body and to bring the same in the revenue record, Competent Authority has been designated who will hear the parties on the basis of applications received from the aggrieved party and transfers the title in favor of the legal body by passing the necessary order and deemed conveyance certificate and appoint an authorized officer to execute the conveyance deed in favor of the society and execute on behalf of non-co-operative builder or the land owner. Getting the title of land and building by adopting the above procedure is known as deemed conveyance.

By |September 27th, 2019|DIFFERENCE BETWEEN CONVEYANCE AND DEEMED CONVEYANCE|Comments Off on DIFFERENCE BETWEEN CONVEYANCE AND DEEMED CONVEYANCE

Effect of the RERA Act

The Real Estate (Regulation & development) Act , (RERA) is a revolutionary reform by the Government of India in the real estate sector. Promoting the professionalism and infusing the transparency, this Act strikes out all unambiguous deeds of doing business in the real estate sector. Well, we all know that the motive of the RERA is to safeguard the interest of buyers, but the way of doing so by the RERA is usually misunderstood.

If a promoter fails to obtain the permission, the Real Estate Regulatory Authority will not approve the project registration and the developer can’t market or sell the units. It also states that the project must be verified by an authorised architect, including minor alternations after the construction of the project. Thus, the RERA will not directly verify the documents related to real estate projects submitted by the developers. It makes the promoter, engineer and the architect involved in the project construction liable for any ambiguities and misconducts.

So, one can buy the RERA registered projects, but the buyers must verify all the documents related to the project by themself. Also, the rules may change from state to state so we would recommend buyers to go through the state-wise RERA rules before taking any decision.

By |September 26th, 2019|Uncategorized|Comments Off on Effect of the RERA Act

Impact of RERA on Real Estate Agent.

From 1st May onwards, every real estate agent has to register his or her name as per the Real Estate (Regulation and Development) Act (RERA). The law was amended and brought into action by the government for the fair practice in the real estate industry.

Under the RERA Act, the real estate agents who have registered themselves, as per the government rules, will be able to transact with the clients in a legal way. The statistical study says that the brokerage industry in this real estate segment alone has a turnover of $4 billion every year and growing. The study also depicts that there are 500,000 – 900,000 brokers as an estimated number in India. In fact, the number can be more also. Before the amendment of the act, the brokerage segment in the real estate industry was unregulated and totally unorganized. The channels had no specific rulebook to charge brokerage fee to the respective clients.

By |September 26th, 2019|Uncategorized|Comments Off on Impact of RERA on Real Estate Agent.

Rera Advocates in Pune

*Developers who are pushing ahead dates to hand over apartments cannot find escape now, with state regulator Maharashtra Real Estate Regulatory Authority (MahaRERA) ruling that the possession date of an ongoing project should be corresponding to the pending work.

*Builders will have to refund GST paid by home buyers in case he cancels the flat booked in the last fiscal and will be allowed to avail credit adjustment for such refunds, the tax department has said.

By |September 26th, 2019|Uncategorized|Comments Off on Rera Advocates in Pune

Advocates for RERA in Pune

Some of the important compliances are:

Informing allottees about any minor addition or alteration.
Consent of 2/3rd allottees about any other addition or alteration.
No launch or advertisement before registration with RERA
Consent of 2/3rd allottees for transferring majority rights to 3rd party.
Sharing information project plan, layout, government approvals, land title status, sub-contractors.
Increased assertion on the timely completion of projects and delivery to the consumer.
An increase in the quality of construction due to a defect liability period of five years.
Formation of RWA within specified time or 3 months after majority of units have been sold.
The most positive aspect of this Act is that it provides a unified legal regime for the purchase of flats; apartments, etc., and seeks to standardise the practice across the country. Below are certain key highlights of the Act:

By |September 26th, 2019|Uncategorized|Comments Off on Advocates for RERA in Pune

Committee, for ‘effective’ implementation of RERA

The government has constituted a committee, to suggest recommendations to strengthen the Real Estate (Regulation and Development) Act (RERA) and to remove difficulties in its implementation, an official said, on December 31, 2018. The decision to form the committee, to be headed by union housing and urban affairs joint secretary Shiv Das Meena, comes months after the ministry organised four workshops where stakeholders, including home-buyers, had given suggestions for effective implementation of the Act.

As of now, 28 states and union territories have notified the rules under the real estate law. “The ministry has formed a committee under its joint secretary Shiv Das Meena. The panel will look into the suggestions received at the four workshops on RERA and then, submit its recommendations to the ministry. The committee will also consider whether there is a need for changes under removal of difficulties of the central law’s clause,” the official told PTI. If needed, the committee may suggest amendments to the RERA, he said, adding that the panel will hold its first meeting on January 3, 2019.

The Government of India enacted the Real Estate (Regulation and Development) Act 2016 on 26th March 2016 and all its provisions came into effect, from May 1, 2017.

Developers have been given until the end of July 2017, to register their projects under RERA. Likewise, real estate agents, who also fall under its ambit, are still in the process of registering themselves. Several states still need to notify the rules under the Act and most importantly for buyers, developers/promoters need to register their projects under RERA.

By |September 26th, 2019|Uncategorized|Comments Off on Committee, for ‘effective’ implementation of RERA

COMPARISON BETWEEN CO-OPERATIVE HOUSING SOCIETY AND CONDOMINIUM

COMPARISON BETWEEN CO-OPERATIVE HOUSING SOCIETY AND CONDOMINIUM

Act – Co-operative Society, which is regulated by the Maharashtra Co-operative Societies Act, 1960.
Act – An alternative to a Co-operative Housing Society was introduced by the Maharashtra Apartment Ownership Act, 1970. Condominium is a Building or Complex of Buildings containing a number of individually owned Apartments or houses. ownership of common areas is shared by all.
Requirement for formation – Generally require minimum 10 members/Flats to form CHS.
Requirement for formation – In Condominium, even one person who owns the entire building can form a Condominium provided there are at least five Apartments in the building.
Conveyance Deed of the land – The title of the land and the building is transferred and conveyed to the Society, which becomes the owner thereof.
Conveyance Deed of the land – The title of each Apartment rests with the Apartment owner, who also has a proportionate undivided interest in the land on which the building stands the common areas and facilities of the building.
Share Certificate – A Society issues certain shares to its members as per the Bylaws and the Share Certificate becomes an important title deed, since the allotment of the premises are related thereto.
Share Certificate – This is not so in a Condominium of Apartments/Buildings.
Management Committee – The affairs of the Society are managed by the Managing Committee which is elected by the members of the Society. The Managing Committee elects a Chairman, Secretary, and a Treasurer. Election conducted by State Co-op Election Authority(SCEA)
Management Committee – Similarly, the affairs of a Condominium are managed by the Board of Managers who is elected by the members of the Apartment Owners Association. The Board also elects a President, Vice-President, Secretary and a Treasurer.
Share Charges & Flat Transfer fee – Under the Model Bylaws, a Society can charge only Rs. 500/- as Transfer Fee with a maximum of Rs 25,000/- as a premium.
Share Charges & Flat Transfer fee – The Bylaws can be more flexible and the amount of Transfer Fee can be provided therein.
Renting Out Flats – In a Society, permission of Managing Committee including ‘Police Verification’ & Register L&L is required.
Renting Out Flats – In a Condominium, the owner can give his Apartment on lease or leave and license basis without the approval of the Board of Managers
Voting Rights – Every member has one vote, irrespective of the area of their premises.
Voting Rights – Every Apartment owner has a voting right in proportion to the value of his premises which is generally as per the area of the Apartment owned by him and which is defined while forming the Condominium.
Dispute Resolution – In a Society, disputes are generally referred to the Registrar appointed under the Act or to a Co-operative Court, depending on the nature of the dispute.
Dispute Resolution – The Court having jurisdiction over the area in which the Condominium is located, hears the disputes.
Membership cease & Expel – A Society can expel its member under certain extreme circumstances.
Membership cease & Expel – In case of a Condominium, there is no such provision. However, if an Apartment owner fails to comply with the Bylaws or the Rules and Regulations, either damages or injunctive relief or both can be claimed against him.
Nomination – In a Society, a member can nominate a person in whose favour shares of the Society should be transferred upon the member’s death.
Nomination – No such facility is available in a Condominium. An Apartment can be transferred to a person to whom the Apartment owner bequeaths the same by his will or to the legal representative of the Apartment owner’s estate.
Bye Laws of society – Bye-laws and Rules of ‘Society’ are binding on all the residents and nobody can act as per his/her whims. Hence, if the Society decides to ban any objectionable commercial activities in the flats such as noise-making music classes or using the flat for catering or courier activities etc or not to rent out to bachelors etc, then all the residents have to abide by it
Bye Laws of society – But if it is an Apartment, then owners can violate the Apartment Rules and the Apartment Body can just file a case in the Civil Court.
Redevelopment – When the building contemplates redevelopment after 25-30 years, the Society’s decision will be final and hence the Society members will have negotiation power with the builder at that time.
Redevelopment – But if in case of an Apartment, the consent of every Apartment-owner is required and hence it goes into an endless delay due to lack of a common decision acceptable to everybody.

By |September 26th, 2019|COMPARISON BETWEN CO-OPERATIVE HOUSING SOCIETY AND CONDOMINIUM|Comments Off on COMPARISON BETWEEN CO-OPERATIVE HOUSING SOCIETY AND CONDOMINIUM

Process of Co-operative Housing Society Registration

Process of Co-operative Housing Society Registration

• 60 % of the Promoters are must be ready to form Co-op. Housing Society. • If flats are sold as per the Maharashtra Ownership Flats Act,1963 [MOFA] then it is the duty of the Builder / Developer to form society and hand over the Account + Documents to Provisional Working Committee [PWC] In this case the builder become CP and other flat owners become Promoters for Registration purpose. This society registers under Cooperation.
• When the builder is not registering society due to some reasons or not support to registered society then flat purchasers can apply for registration of Co-operative Housing Society under Non Co-operation. In this case one of the flat owners should be elected as CP for Registration purpose. In this case some more time is taken to registered society as registrar is issue notice to builder for Non Co-operation. If no response then ex-party decision are taken for registration of the society. Now all the case of Non Co-operation Registration decisions is given by District Deputy Registrar [DDR] then society is registered
• All flat owners should hold meeting and elect Promoter. All power for Registrations, documentation etc. should be given to promoter. The resolution should be passed and must be sign by all flat owners who wish to become member of the Co-operative Housing Society • Appoint Consultant / Legal Advocate for registration and ask him to comply all requirements. All members together also can do work for registration.
• For registration of Co-op. Hsg. Society the following documents should be filed to Dy. Registrar / Asst. Registrar of Co-operative Department area concern in order as follow
1. Applications for Name to be reserved for Proposed Society’s
2. Form of resolution electing a CP and Promoter and giving them authority for doing certain acts on behalf of the proposed society
3. Application form “A” 4 copies
4. Information in Annexure ” A ” ” B ” ” C ” 4 copies
5. Bye-Law of the Society 2 copies
6. Details of Accounts Annexure “D” 2 copies
7. Bank Balance Certificate in Original 1 copy in Original
8. Agreement of Flat 1 copy
9. Advocate Search Report 2 copy [Title Certificate]
10. Society’s Building Plan 2 copies
11. Layout Plan 2 copies
12. Sanction Plan from Authority 2 copies
13. O.C / C.C copy 2 copies
14. Promoter’s Guarantee in form ” X ” On Rs. 100/- Stamp paper & notarized 1 copy
15. Guarantee in form ” Y ” On Rs. 100/- Stamp paper & notarized 1 copy
16. Guarantee in form ” Z ” On Rs. 100/- Stamp paper & notarized 1 copies
17. 7/12 or City Survey Revenue Record of Land [not more than 1 month old] 1 copy
18. Promoters Affidavit on Rs. 100/- Stamp paper & notarized 1 copy
19. Indemnity Bond on Rs. 100/- Stamp paper & notarized 1 copy
20. NA Certificate / ULC 2 copy
21. Plot area Land Map 2 copies
22. Scheme
23. Registration Fee Challan for Rs. 2500/- 1 copy original
24. Builder Non Co-operation form Z on Rs. 100/- Stamp paper & notarized if required 1 copy
25. CP Affidavit for Child Labour on Rs. 100/- Stamp paper & notarized 1copy
All this forms are available at your District Co-operative Housing Society Federation.
On submission of above document the Dy./Asst. Registrar will go through the papers And document. If found OK he will make order for issue of Registration Certificate. If any deficiencies are found then the applicant will be inform accordingly and documents will be corrected wherever necessary. When all papers are in order, he will issue order for issue of Registration Certificate.
Registration Certificate is issued with covering letter and Officer’s name is mentioned who will attend First General Meeting. Normally the Officer concern is not attending meeting. In absence, all members have to hold meeting and have to elect Provisional Working Committee [PWC] whose working period will be ONE Year. After electing PWC the member of PWC has to submitted the M-20 bond on Rs. 100/- stamp paper with the sign of Officer’s whose name is in Covering latter to Dy./Asst. Registrar. All Rule and Regulations ,resolution and minutes which is written in AGM Register must be sign by Officer’s name is mentioned in covering letter it is the most important step.[Many society forget this which create problem latter] After First Annual General Meeting PWC is replaced with new Working Committee [WC] whose working period will be FIVE Year. The new WC election can conduct before PWC time over with proper election process. WC also has to submit the M-20 bond on Rs. 100/- stamp paper with the sign of election officer to Dy./Asst. Registrar
When application for Name reservation of Society has given , the Dy./Asst. Registrar give instruction to Open Bank Account in Dist. Central Co-op. Bank The Account has to opened in the name of CP And deposit all money of Share Capital Contribution [per member Share Money is Rs. 50*10 = Rs. 500 i.e. 10 share of 50 rupees each ] and Member ship Fees of Rs. 100/- i.e. Per member you have to deposit Rs. 600/- in bank and obtain Bank Balance Certificate and submitted it to Dy./Asst. Registrar. After First Annual General Body Meeting the Bank Account has to transfer in the name of Society. For bank Account operation Chairman sign must and either Secretary and Treasurer. Expenditure has to be made as per provision of Bye-Laws. Bank and Cash Transaction [Collection and Payment] are handled by Treasure when Billing Clerk or Accountant are not been kept.

By |September 26th, 2019|Process of Co-operative Housing Society Registration|Comments Off on Process of Co-operative Housing Society Registration

A COMPLETE GUIDE TO DEEMED CONVEYANCE

A COMPLETE GUIDE TO DEEMED CONVEYANCE

Most of the flat-owners of the newly constructed Societies/apartments do not have their sale deeds or conveyance deeds. Mostly in the newly constructed buildings, the builders provide for forming a housing co-operative society to which they shall transfer their interest in the property. Then the builders form the society but do not transfer the title of the property (read ownership) to the flat-owners or the society till he has transferred all the rights in the building/ Societies/apartments. Thus the builders/promoters are benefiting from the buyers lack of awareness and information.
To curb this practice, amendments were carried out in the Maharashtra Ownership Flats Act, 1963, in 2008 to appoint a Competent Authority (Registrar of Co-operative Housing Societies) to hear the grievances of such Societies/apartments owners and to safeguard their interest by executing deemed conveyance of such societies u/s 11(3) of Maharashtra Ownership Flats Act, 1963.
Ved Legal is having enough experience to deal with these kinds of Deemed Conveyance of Co-operative Housing Societies, in and around Pune. Any aggrieved society or apartment holder can get resolution from us in regards of the same.
Deemed Conveyance and its Significance
Conveyance is transfer the title of land and building by promoter/landowner in favour of housing society by execution of Conveyance Deed. As per the provision contemplated in section 11 of Maharashtra Ownership Flat Act 1963, Conveyance is the right of Co-operative Housing Society and the Duty of the property Developer/Promoter to be executed within 4 months from date of Registration of Co-Operative Society.
After land and Building is conveyed i favour of Co-Operative Society and the title of property is fully and finally recorded in the property card and other revenue records then only the property becomes completely free and marketable.
As per Housing Society Bye-laws the main objective of formation of the society is to obtain conveyance and if conveyance is executed within 4 months from date of registration of society case can be filed against the promoter /landowner of the land to obtain the conveyance as per section 13 of MOFA 1963 failure to give conveyance is an offence and the promoter/landowner of land can be imprisoned upto 3 years or fine or both.

MEANING OF DEEMED CONVEYANCE:
Deemed Conveyance occurs when the builder/land owner or the legal heir refuse to co-operate in handing over conveyance to the Co-operative Society under the Section 11(3) of Maharashtra Ownership Flats Act, 1963. In such case, the housing society has to appear before the District Deputy Registrar, who will hear the case of both parties i.e. the housing society and the builder and would pass the required order of Conveyance. It is a remedial measure obtained by the society against the builder/landowner who does not wish to convey the property since he/she sees a commercial gain out of the property in future. This could include usage of potential FSI for their personal gain.

Deemed Conveyance is final conveyance and the same can be registered. Once the designated Competent Authority has passed the order, there cannot be an appeal against it.

NEED FOR DEEMED CONVEYANCE:
In a situation when a promoter or owner of residential premises/ buildings does not transfer/convey the ownership of the flats to the housing society or association of persons (AOP), the society or AOP can make an application to Registrar of Co-operative Housing Societies, to transfer the ownership of the said flats to them. This process is carried on through Deemed Conveyance of the title of the buildings and land in favour of the Society or AOP without the need of the builder to do so.

PROVISIONS OF LAW ON CONVEYANCE:
As per the Housing Society bye-laws, the main objective of formation of the Society is to obtain the Conveyance; and if Conveyance is not given by the Builder within four months from the date of registration of the Society, Case of Deemed Conveyance can be filed against the Builder to obtain the Conveyance before the District Deputy Registrar. As per Section 13 of Maharashtra Ownership Flats Act, 1963, failure to give Conveyance in favour of cooperative housing society is an offence and the Builder can be imprisoned up to 3 years or fined or both.

ADVANTAGES OF CONVEYANCE:
1. Getting a proper and legal title in the name of the Society.
2. Retaining the additional FSI as per the Government announcements.
3. Property will be free and marketable.
4. Society can raise the loans for repairs and reconstruction by mortgage.
5. Permission from planning authorities is possible if the building has to be reconstructed at a later date due to dilapidation of the structure due to age or by earthquake.
6. Society can take the benefit of TDR.
7. Members can receive compensation from Builder on redevelopment of the building.

DISADVANTAGES OF NOT HAVING CONVEYANCE DEED
Even though you have purchased ownership flat, you are not the owner of the land and building. 2. In the event of a building collapse or damage to the building, you cannot reconstruct the building without the permission of the Builder / Land owner.
1. The Builder/Developer may mortgage the property purchased by you as he is the legal owner and holding the Title Deeds of the Property.
2. The Builder/Developer may tap the benefits in case the building is later taken up for redevelopment or if the plot has some unutilized floor space index.
3. The Builder may make profit by sale of open spaces, gardens, terrace, parking space belonging to the Society.
4. The Builder may demand a huge amount from the Society, if Conveyance is sought by the Society after a lapse of many years.
5. The Builder may sell the entire Development Rights and the Legal Rights on the land to third party and create a third party interest in the Property and the Society will have to incur a huge amount to clear the same.
CONDITIONS PRECEDENT FOR GETTING A DEEMED CONVEYANCE:
There are certain important conditions which need to be fulfilled to go ahead for deemed conveyance, some of them are:

1. At least 60% of the flats in that scheme should be sold.
2. A Co-operative Society or Association of Persons should have been formed of the flat-owners and at least 3-4 months should have been passed since then.
3. There should be communication between the builder and the society or AOP regarding Deemed Conveyance wherein the builder should have made a promise of completion of conveyance or refused to do the same.
4 . A Resolution must be passed

PROCEDURE FOR FILING AN APPLICATION FOR DEEMED CONVEYANCE:
After the above mentioned conditions are fulfilled, the following steps shall be taken:
Write a letter /email to builder/ promoter requesting him to provide a draft of the SALE DEED/ CONVEYANCE DEED or providing the draft to him and requesting him to sign the same.
• If the Builder rejects or postpones the same, send him a legal notice through an advocate requesting for the same.
• Even then if the builder refuses, File an application with the Registrar of Co-operative Societies together with all the relevant documents and 2000 Rs. Court stamp fees.
• Self-attestation all the copies enclosed (by the society)
• The Competent Authority will assess the application and if any documents are missing he will ask the applicant to correct the mistake within fifteen days.
• Thereafter, notice would be sent to the promoter and the land owners.
• After receipt of the notice by the land owners and the promoters, the authority will hear both parties in the first hearing and ask both parties to produce further evidences in next hearing.
• Thereafter, second hearing would be held and if the builder or landowners do not attend both first and second hearing then the authority will pass an exparte order.
• Thereafter, the third and final hearing would be held and the authority would be held and order would be passed unless a legal question is raised.
• Normally the whole process is completed within a period of 6 months.
DOCUMENTS REQUIRED:
Further, the application required to be made with the Registrar shall be accompanied by copies of certain 20 odd documents which the society shall have to prepare or get prepared.

The papers required for doing Deemed Conveyance are as follows:
o Application Form 7 to the District Deputy Registrar, Co-operative Societies, affixing a court fee stamp of Rs 2,000 on the application
o Affidavit made before the Notary or Executive Magistrate True copy of the Society Registration Certificate
o Stamp duty paid and registered agreement copy of 1 individual flats/ shops with Builder/Developer
o List of members in prescribed format
o Index-II for each member as issued by the Sub-Registrar of Assurance
o Copy of the Development Agreement between land owner and builder
o Copy of the Power of Attorney between land owner and builder
o Copy of the legal notice issued to the original owner or developer for doing conveyance
o Details of corresponding address telephone number etc. of the original owner or developer
o Draft conveyance deed/ Declaration proposed to be executed in favour of the applicant

Documents to be obtained from City Survey Office, for submission:
o City (CTS) Survey Plan
o Property Registration Card or
o 7/12 extract of the Land
o Village form 6 (Mutation entries from Revenue Office)

Documents to be obtained from the Collector’s Office, for submission:
o Copy of the Non-Agricultural Order
o Certificate of the exclusion from Land Ceiling Act (ULC) Certificate

Documents to be obtained from the concerned Municipal Authority Office, for submission:
o Copy of the approved plan
o IOD
o Commencement Certificate
o Building Completion Certificate
o Occupation Certificate (not compulsory)
o Property taxes paid
o Location plan of the building

Documents to be obtained from other professionals, for submission:
o Search Report of the land issued by the Solicitor/Advocate
o Title Certificate of the Property issued by the Solicitor/Advocate (Search by minimum for last 30 years)
o Land Measurement Map/ Architect’s Certificate (layout plan of the plot)
o Certified copy from Panel Architect about the utilization of full FSI or FSI if any left in respect of the said property /Plot.
After, the Application is heard by the Registrar he may grant an order for deemed conveyance which shall then be produced before a court for execution and hence the conveyance may be done by a court order.
PROCEDURE:
Stage 1- Preparation for Deemed Conveyance
During this stage the Managing Committee prepares the Members of the Co- Operative Housing Society for Deemed Conveyance.
Stage 2- Documentation for Deemed Conveyance
During this stage the Documents Required for Deemed Conveyance are collected/ organized & the Case is prepared.
Stage 3- Legal Case for Deemed Conveyance
During this stage the case is filed before the Competent Authority & after contesting the same the Order & Certificate upholding the right of Deemed Conveyance of the Society is obtained.
Stage 4- Registration of Deemed Conveyance
During this stage the Deemed Conveyance Deed is Adjudicated, properly Stamped & Registered.
Stage 5- Transfer of Property after Deemed Conveyance
During this stage the Society Name is incorporated in the Land Revenue Records.
Let’s discuss each step in detail:

1. Preparation for Deemed Conveyance:
This is a very important stage where the Managing Committee prepares the Members of Co- Operative Housing Society for the Deemed Conveyance.
The Managing Committee convenes a Special General Meeting (SGM) of the Society by giving suitable notice highlighting the agenda.
The Managing Committee places before the SGM the difficulties faced for obtaining the Conveyance from the Land Owners/ Property Developers. The Managing Committee explains the effects of non- availability of Conveyance to the Members. The Managing Committee explains the Procedure & Benefits of Deemed Conveyance to the Members.
During this SGM the following Resolutions are typically passed.
1. Resolution for going ahead with Deemed Conveyance
2. Resolution for Appointment of Authorized Representative
3. Resolution for Appointment of Legal Consultant for Deemed Conveyance
4. Resolution for Per Member Contributions
2. Documentation for Deemed Conveyance:
This is the most crucial step in obtaining deemed conveyance. It is a very meticulous job and make sure all the documents are lined up within the right format. You would require land revenue records, municipal corporation records, society records, property development records and professional certificates.
All these documents can be obtained from various departments such as Land revenue records from City Survey Office, Tahasildar/Talathi Office & District Collector Office, municipal corporation records from Building Proposal Department of the Municipal Corporation. Society records and certificates can be obtained from society offices and professionals.
Once all the documents are lined up, society needs to fill in Deemed Conveyance Application- Form VII and attached all the related documents. In case of deemed conveyance, a legal notice is sent to the developer for their consent. In regular conveyance procedures, since the developers or promoters are willingly providing the rights lot of documents can be easily recovered from them.
Once the form is filled up and all documents are annexed it is submitted to the Competent Authority- the District Deputy Registrar of Co- Operative Societies of the particular District.
3. Legal Case for deemed conveyance:
Once the application is submitted to the authorities they issue Deemed Conveyance Scrutiny Report- Form VIII within 1 month. Once the compliance is provided the authorities issues Summons & Newspaper Notices to the Land Owners & Property Developers for appearing for the hearing.
During the hearing process authorities take into consideration the arguments of the both parties. The process takes place within 3-4 months. Once all the arguments are documented the office issues a Deemed Conveyance order within 1 month. The whole process is completed within 6 months as this is a time bound activity.
4. Registration of deemed conveyance:
A deemed conveyance deed is created during this phase and is signed by both societies and developers. If developers do not appear for hearing in the prior stage (Which is the case in deemed conveyance), authorities have the power to sign the deed on behalf of developers.
The society needs to conduct a meeting and appoint 3 members to sign the deed. Post that the deed is submitted to district stamp office for adjudication. If all the members have paid their stamp duty and if there is no balance FSI, the office issues adjudication certificate. (Note – Deed only requires Rs 100 stamp duty). The adjudication certificate needs to be then franked from local bank and resubmitted to registration office.
The registration office then issues notice to land owner/developer to verify if there is any stay order against the deed of conveyance. (Note – The developer can get the stay order only from high court). If there is no stay order the deed of deemed conveyance is registered and then the office issues scanned documents and Index II. This mark end of registration process and the society becomes the owner of the land and structure.
5. Transfer of property:
In this phase a new application is submitted to various departments to make mutation entries in their records. This would make the process complete.

By |September 26th, 2019|A complete guide to Deemed Conveyance|Comments Off on A COMPLETE GUIDE TO DEEMED CONVEYANCE

Registration of Real Estate Projects

Functions and duties of Prompter/Builder

The Promoter/Builder upon receiving his Login Id and password under clause (a) of subsection (1) of The Real Estate (Regulation and Development) Act, 2016, need to create his web page on the website of the Authority and enter all details of the proposed project as provided under sub-section (2) of section 4, in all the fields as provided, for public viewing including-

a) details of the registration granted by the Authority.
b) quarterly up-to-date the list of number and types of apartments or plots as the case may be booked.
c) quarterly up-to-date the list of number of garages booked.
d) quarterly up-to-date the list of approvals taken and the approvals which are pending subsequent to commencement certificate
e) quarterly up-to-date status of the projects and
f) such other information and documents as may be specifid by the regulations made by the authority.

By |September 25th, 2019|Uncategorized|Comments Off on Registration of Real Estate Projects