BUILDER’S HANDOVER PROCESS

BUILDER’S HANDOVER PROCESS

The date of handover from builder to the registered owners association is an important day for new apartment owners and all residents. It has to be taken seriously and detailed due diligence must be done when interacting with the builders during this handover process. Once the formal handover to the Owners Association is completed, the onus is on the association to run the affairs of the society and to ensure its smooth functioning. The association must be prepared for this day for 3+ months leading to this event.
It is recommended that owners collaboratively engage with the builder right from late construction stages that will help them to take-up this responsibility in future. The builders can also reach out to representatives from the owners group to assist in the selection of maintenance agency which prepares them for the handover process.
Based on our experience in interacting with various builders and associations, we have collated a check list that associations can use when in dialogue with the builder on the handover process:
1. Get approved building plan which includes block-wise and floor-wise details
2. Collect the Completion Certificate which ensures adherence of the approved plan
3. No Objection certificates from pollution, fire, water and electricity authorities
4. Hard copy and soft copy (in CD) of all approved engineering drawings; look for approval seal on the drawings
5. Registration and parent documents
6. Drainage, sewage, Fire protection and common area power layout drawings
7. Car parking layout drawings (with numbering)
8. Asset Inventory of all movable and immovable equipment purchased; numbered in order (list needs to be exhaustive)
9. Record of recent service history on key equipment’s like lifts, DG sets, STP and WTP
10. AMC and warranty details; Original bills of equipment purchased (motors, Sewage and Water Treatment Plant, Generators, Gym items like treadmill)
11. Lift license details and next renewal date
12. STP/WTP vendor details, plant layout, operation manual and drawings
13. Receipts of property, electricity and water payments paid
14. Handover of corpus amount to the association
15. Share recent expenses incurred on various maintenance activities and account heads; will assist to budget coming year (staff salaries, purchase of cleaning material, swimming pool maintenance etc)
16. Contract signed with maintenance agency; agreed SLAs
17. Insurance taken for assets and third party lift insurance
18. Audited account statement at the time of handover
19. Arrange for introductory meeting with important suppliers and vendors

By |August 8th, 2019|Builder’s Handover Process|Comments Off on BUILDER’S HANDOVER PROCESS

DEEMED CONVEYANCE PROCEDURE FOR CHS BECOMES EASY

DEEMED CONVEYANCE PROCEDURE FOR CHS BECOMES EASY

The Maharashtra government has relaxed the terms for the deemed conveyance (DC)-ownership right of plot certificate from the builder, by bringing down the number of documents required from 12 to 8 and stipulating that DC will be given even if the society does not have an Occupation Certificate (OC) or the Building Completion Certificate (CC).
It is mandatory for land-owners or developers to convey the title of the plot within four months of the formation of the housing society. In many cases, the builders fail to convey the title of properties to the housing societies, in the hope of availing more floor space index (FSI) that may become available in future, or to avail the benefits accrued to them in case the property is redeveloped.
If the builder fails to convey the property, the Maharashtra Ownership Flats Act (MOFA) allows societies to apply for DC. However, having OC was mandatory and was insisted upon by the officials of the cooperative registrar’s office. OC is given only when the building is complete in all respects and has complied with the mandatory norms laid down by the government authorities to make it ready for occupation. Since most of the builders abandon the projects before complying with the norms and conditions, OCs are not given to the societies. Developers just hand over the possession and exit the project, leaving the residents high and dry.
However now, the DC will be issued even if housing societies have submitted such documentary evidence as the formation of the society or the payment of property tax by the society.
As per the GR issued on 22 June 2018, by the state cooperation department, it has been made mandatory for the registrar of cooperative societies to register documents of the applicants within a day. Besides, as per the Maharashtra Right to Public Services Act, 2015, the DC should be issued within six months. If an official fails to provide and approve it within the prescribed period, then he or she will be penalized between Rs500 and Rs. 5,000/-
The applicants should submit the applications with a court fee of Rs 2,000. In case the FSI has already been consumed, a certificate of an architect that the total FSI has been consumed would suffice. In addition, they have to give an indemnity bond stating that they will take responsibility for the building and adhere to all required rules and regulations. If there are more than one society on one plot, the details of proportionate area and ground coverage should be furnished.
The documents required for conveyance include society registration certificate, approved layout, 7/12 extract, sale deed of each flat owner or heir document, list of registered members of the society, occupation certificate, non-agriculture certificate of that particular plot and notice copy etc. In the absence of sale deeds of all members, the sale deed of even one member would be sufficient, states the GR.
While submitting the conveyance application and documents to the registrar, a copy of the same application also needs to be submitted to the stamp duty and registration department for its speedy approval. The applications will be accepted online as well as offline. The officials of the concerned department such as urban, cooperative, forest and revenue department will have to work in unison so that the applicants are not required to shuttle from one department to another.
The system of issuing DC was started three years ago. However, due to stringent conditions there was no response from cooperative societies. Commenting on the issue, Ramesh Prabhu, Chairman, Maharashtra Societies Welfare Association said “This was a positive step. In many cases, the builders exited the project without getting the OC, and the residents had to bear the brunt. This relaxation will ensure that majority of the societies get deemed conveyance. By a fair estimate over 10,000 cooperative housing societies in Mumbai and neighboring areas, are yet to get the DC. Now they should come forward to take advantage of these relaxed norms.”
There are a sizable number of housing societies in Mumbai that are struggling to get the DC. In absence of DC, redevelopment of some of the societies has been delayed. Some of the developers used to sell the flats till they held the ownership right of the layout and were misusing this right, causing impediment in the way of redevelopment.

By |August 8th, 2019|DEEMED CONVEYANCE PROCEDURE FOR CHS BECOMES EASY|Comments Off on DEEMED CONVEYANCE PROCEDURE FOR CHS BECOMES EASY

CO-OPERATIVE SOCIETY PROBLEMS AND CHALLENGES

CO-OPERATIVE SOCIETY PROBLEMS AND CHALLENGES

Every member of a housing cooperative society should be treated with dignity and respect. No one has a legal duty or personal right to harass other if there is any harassment does occur then there are some adequate measures are speedily available to prevent it recurring and deal with the problem. The case of harassment is of serious nature offence and can not be tolerated it may become a ground of disciplinary action which may include the expulsion.

If Any member of the Housing Cooperative Society faces the problem of harassment by any other member of society or the staff of the management committee in the housing cooperative society shall initiate the procedures against them.
He/she must also:

As per the Bye-laws of the Housing Cooperative, the members must have some essential qualifications;
Permanently reside within the territory of operation of the housing cooperative;
The essential admission fee has paid;
As per the Bye-laws have paid the stipulated charges and purchased the minimum number of shares of the cooperative;

As per the conditions laid down in the Bye-laws of the Cooperative, make the essential down payment within the prescribed limit;

Make a necessary statement to the housing cooperative at the time of membership that whether he/she owns any plot/flat or house in his/her own name or in the name of any other member of his family. Under those conditions, he/she shall quote the reasons to become a member of a housing cooperative.

Cooperative Society Problems and challenges

Meaning and Examples of Harassment

Harassment is undesirable lead on the grounds of race, sex, sexual introduction and so on which has the reason or impact of either abusing the inquirer’s nobility, making an intimidating, threatening, debasing, mortifying or hostile condition for them.

There are given the following examples of the specific types of harassment:-
Bullying-

Bullying might be described as hostile, intimidating, noxious or offending conduct, maltreatment or abuse of intensity through methods planned to undermine, embarrass, stigmatize or harm the beneficiary. There are some examples of bullying:

maltreatment of power or authority;
verbal, written and additionally physical terrorizing for example dangers, derisory comments
relentless unjustified analysis the public disgracefulness having obligations or basic leadership powers pulled back without valid justification or clarification outlandish rejections
Sexual Harassment
It may be homosexual or heterosexual. It might be characterized as any type of undesirable verbal, non-verbal or physical direct of a sexual sort that makes an intimidating, antagonistic, debasing or hostile condition. It may include:
Physical contact
Undesirable comments on clothes and appearance;
Comments of a sexual nature;
Verbal threats;
The Bombay high court on the matter relating to the harassment of the women members said that the housing societies must frame rules and regulations to protect the women members from assault and sexual offenses by different members. The court said to the housing cooperative societies to make rules in the light of the Vishaka Judgement.
In Punita K Sodhi v Union of India and Ors (2010), Delhi High Court held that the idea of restriction may not discover significance for a situation of sexual harassment, as sexual harassment should not be seen as a one-time episode, however the effect of sexual harassment must be contemplated to comprehend it as a proceeding with off-base.
Racial Harassment
Racial harassment is any conduct, conscious or generally relating to race, colour, nationality – including citizenship, or ethnic or national inceptions, which is coordinated at an individual or gathering and which is observed to be hostile or questionable to beneficiaries and which makes an intimidating, unfriendly or hostile condition. It may include:
Insults and racist comments
Use abusive language and display of racially offensive material
Harassment on Grounds of Religion
Religious Harassment is any conduct intentional or something else, relating to religion, religious conviction or other comparative philosophical conviction and it is conduct which can be characterized as undesirable lead abusing an individual’s pride, or making an intimidating, unfriendly, debasing, embarrassing or hostile condition.
Political Harassment
Political Harassment means the members are harassed on the political grounds by the management committee staff or the other member of the housing cooperative.

By |August 8th, 2019|CO-OPERATIVE SOCIETY PROBLEMS AND CHALLENGES|Comments Off on CO-OPERATIVE SOCIETY PROBLEMS AND CHALLENGES

DEEMED CONVEYANCE PROVISIONS UNDER MOFA

Amendments in Maharashtra Ownership Flats (Regulation of the promotion of construction, sale, management and transfer) Act, 2005 giving a huge relief to hundreds and thousands of flats purchasers in Maharashtra. Conveyance to the societies was a burning issues which have integrated many problems like property tax, housing finance documentations and major repairs or redevelopment.

The highlights of the amendments are as under:
• Builder/s will have to execute the conveyance.
Power is given to the District Deputy Registrar to act as Competent Authority. (Sec. 5A)
• Power is given to Competent Authority for registration of Co-operative Society under the provisions of Maharashtra Co-operative Societies Act, 1960. (Sec. 10(1) )
• It is the duty of the promoter (builder) to file with the Competent Authority within the prescribed period a copy of the conveyance executed by him (Sec. 11(2))
• If the promoter fails to execute the conveyance in favour of Co-operative Society, Company or Associations or Apartment Owners as the case may be, then the flat purchasers can approach the Competent Authority with true copy of registered agreement of all the flat purchasers including Occupation Certificate, Registration Certificate of the society then in such circumstances the Co-operative Society, Company or Associations is entitled to have unilateral deemed conveyance (Sec. 11(3))
• The proceedings before the Competent Authority have to be completed within a period of 6 months. The Competent Authority must verify the authenticity of the document produced before him and after giving a reasonable opportunity to the promoter, if satisfied will issue a certificate to the Sub-Registrar or any other Registration Officer under the Registration Act, 1908, certifying that it is a fit case for enforcing unilateral execution of conveyance deed conveying the right, title and interest of the promoter in the land and the building in favour of the applicant, as deemed conveyance(Sec. 11(4))
• The sub registrar after receipt of the certificate issued by the Competent Authority along with the unilateral instrument of conveyance can issue summons to the promoter to show cause why the unilateral instrument should not be registered as deemed conveyance. However, reasonable opportunity of being heard may be given to the promoter. If the Sub-Registrar is satisfied then he will register the unilateral conveyance as ‘deemed conveyance’. (Sec. 11(5))
• The Competent Authority has been created who has powers to award criminal imprisonment to the builder/s for a period not less than 6 months and not more than 1 year and / or along with fine ranging from Rs 10,000/- to 50,000/-. (Sec. 13(3)(a) & 13(3)(b))
• The builder/s if convicted will not be able to carry on construction activities for a period of five years. However, the disqualification shall not affect the permission for construction of flats already granted. (Sec. 13 (4), 13(5) & 13(6) )
• The Competent Authority shall be deemed to be a public servant as per the provisions of Indian Penal Code. (Sec. (13B)
• Proceedings before Competent Authority shall be aimed to be judicial proceedings as per the provisions of Indian Penal Code. (Sec. 13C)
• Competent Authority shall be deemed to be a Civil Court for certain purposes. (Sec. 13D)
• No action can be taken against the Competent Authority for acts done in good faith by the Competent Authority. (Sec. 13E)

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |August 7th, 2019|Uncategorized|Comments Off on DEEMED CONVEYANCE PROVISIONS UNDER MOFA

PROCEDURE FOR REGISTRATION OF CO-OP. SOCIETIES

* PROCEDURE FOR REGISTRATION OF CO-OP. SOCIETIES

1.The first Step is to get 10 Individuals together who are desirous of forming a Society.
2.A Provisional Committee should be formed and a chief Promoter should be elected from amongst them.
3.A Name for the Society has to be selected.
4.An Application has to be made to the Registration Authority for reservation of Name and a letter to that effect has to be obtained confirming the reservation of Name. The name once reserved is valid for 3 Months.
5.The entrance fees and share capital has to be collected from the prospective members.
6.A Bank account has to be opened in the name of the proposed society as per the directions of the registration Authority. The entrance fees and share money has to be deposited in the bank account and the certificate from the bank has to be obtained in that respect.
7.The registration fees has to be deposited with the Reserve Bank of India and receipted 1challan thereof is to be obtained.
8.The application for registration of the society should be submitted to the Registrar of Societies of the concerned municipal ward. The documents to be submitted for registration are as follows:
a. Form No. A in quadruplicate signed by 90% of the promoter members
b. List of promoter members
c. Bank Certificate
d. Detailed explanation of working of the society.
e. 4 copies of proposed bye-laws of the society.
f. Proof of payment of registration charges.
g. Other documents like affidavits, indemnity bonds, any documents specified by the Registrar also have to be submitted.
9.The Registrar will enter the particulars in register of application maintained in Form “B” and give serial number and issue receipt in acknowledgment of the same.
10.On registration, the Registrar will notify the registration of the Society in the Official Gazette and issue Registration Certificate.

By |August 7th, 2019|PROCEDURE FOR REGISTRATION OF CO-OP. SOCIETIES|Comments Off on PROCEDURE FOR REGISTRATION OF CO-OP. SOCIETIES

PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

Amendments in Maharashtra Ownership Flats (Regulation of the promotion of construction, sale, management and transfer) Act, 2005 giving a huge relief to hundreds and thousands of flats purchasers in Maharashtra. Conveyance to the societies was a burning issues which have integrated many problems like property tax, housing finance documentations and major repairs or redevelopment.

The highlights of the amendments are as under:
• Builder/s will have to execute the conveyance.
Power is given to the District Deputy Registrar to act as Competent Authority. (Sec. 5A)
• Power is given to Competent Authority for registration of Co-operative Society under the provisions of Maharashtra Co-operative Societies Act, 1960. (Sec. 10(1) )
• It is the duty of the promoter (builder) to file with the Competent Authority within the prescribed period a copy of the conveyance executed by him (Sec. 11(2))
• If the promoter fails to execute the conveyance in favour of Co-operative Society, Company or Associations or Apartment Owners as the case may be, then the flat purchasers can approach the Competent Authority with true copy of registered agreement of all the flat purchasers including Occupation Certificate, Registration Certificate of the society then in such circumstances the Co-operative Society, Company or Associations is entitled to have unilateral deemed conveyance (Sec. 11(3))
• The proceedings before the Competent Authority have to be completed within a period of 6 months. The Competent Authority must verify the authenticity of the document produced before him and after giving a reasonable opportunity to the promoter, if satisfied will issue a certificate to the Sub-Registrar or any other Registration Officer under the Registration Act, 1908, certifying that it is a fit case for enforcing unilateral execution of conveyance deed conveying the right, title and interest of the promoter in the land and the building in favour of the applicant, as deemed conveyance(Sec. 11(4))
• The sub registrar after receipt of the certificate issued by the Competent Authority along with the unilateral instrument of conveyance can issue summons to the promoter to show cause why the unilateral instrument should not be registered as deemed conveyance. However, reasonable opportunity of being heard may be given to the promoter. If the Sub-Registrar is satisfied then he will register the unilateral conveyance as ‘deemed conveyance’. (Sec. 11(5))
• The Competent Authority has been created who has powers to award criminal imprisonment to the builder/s for a period not less than 6 months and not more than 1 year and / or along with fine ranging from Rs 10,000/- to 50,000/-. (Sec. 13(3)(a) & 13(3)(b))
• The builder/s if convicted will not be able to carry on construction activities for a period of five years. However, the disqualification shall not affect the permission for construction of flats already granted. (Sec. 13 (4), 13(5) & 13(6) )
• The Competent Authority shall be deemed to be a public servant as per the provisions of Indian Penal Code. (Sec. (13B)
• Proceedings before Competent Authority shall be aimed to be judicial proceedings as per the provisions of Indian Penal Code. (Sec. 13C)
• Competent Authority shall be deemed to be a Civil Court for certain purposes. (Sec. 13D)
• No action can be taken against the Competent Authority for acts done in good faith by the Competent Authority. (Sec. 13E)
FOR MORE DETAILS CALL:
VED LEGAL,
• Adv. Gajanan Rahate
• Mob: 9763040088
• E_mail: [email protected]

By |August 7th, 2019|PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA|Comments Off on PROVISIONS FOR DEEMED CONVEYANCE UNDER MOFA

WHY CONVEYANCE DEED IS AN IMPORTANT DOCUMENT?

WHY CONVEYANCE DEED IS AN IMPORTANT DOCUMENT?

A deed is a written document or an instrument that is sealed, signed and delivered by all parties to the contract (buyer and seller). It is a contractual document that includes legally valid terms, and is enforceable in a court of law. It is mandatory that a deed should be in writing, and that both parties involved must sign the document.
There are different kinds of deeds, such as lease deeds, partnership deeds, trust deeds, gift deeds etc.

A conveyance deed is essentially one wherein the seller transfers all rights to legally own, keep and enjoy a particular asset, immovable or movable. In this case the assets under consideration are immovable, namely property.

On signing a conveyance deed, the original owner transfers all legal rights over the property in question to the buyer, against a valid consideration (usually monetary). This consideration, however, is irrelevant in the case of gift deeds, as they are based on fraternal or familial bonds.

A ‘conveyance deed’ or ‘sale deed’ implies that the seller signs a document stating that all authority and ownership of the property in question has been transferred to the buyer.
It is required to contain the following:

• Defined demarcation of the boundaries of the property
• Other rights (if applicable) annexed to the property and its use
• The chain of title i.e. all legal rights to the present seller.
• The method of delivery of the given property to the buyer.
• A memo of the consideration, stating how it has been received
• Any other terms and conditions that are applicable as far as the transfer of ownership rights are concerned.

Once the conveyance (or sale) deed has been executed on non judicial stamp paper, it needs to be registered. This can be done by presenting it at the Registrar’s office, and remittance of the registration fee.

Once the registration is done, the transfer moves into the public domain. The Government obtains its revenue in the form of Stamp Duty and Registration Fees, and at this point the process of conveyance is officially over.

get the rights for re-construction of the building only when the deemed conveyance is executed.

By |August 7th, 2019|WHY CONVEYANCE DEED IS AN IMPORTANT DOCUMENT?|Comments Off on WHY CONVEYANCE DEED IS AN IMPORTANT DOCUMENT?

CONVEYANCE SERVICES FOR SOCIETIES

CONVEYANCE SERVICES FOR SOCIETIES:-

In most of the cases people believe that a Purchase Agreement is the final document they need to own. However, a mere purchase agreement does not pass on the developer’s rights on the land to the society. Societies need to make sure they have the complete right to the land, and mere society registration and formation does not provide those rights.
A Conveyance Deed helps societies to gain the right of their land. Post this builder relinquishes his legal right on the land.
We the “VED LEGAL” provide end-to-end conveyance services to the societies including execution of Conveyance Deed, Deemed Conveyance, and Deed of Apartments. We work closely with co-operative societies and government officials and make sure the complete process is hassle free.
With our team of legal advisers and professional approach, we have handled more than 100 cases across Pune. We guide our clients through the complete process of transferring builder’s rights, allocation of additional space and finally establishment of society rights, as per the law.
Our conveyance services include:
Apartment formation:
• Deed of Declaration • Deed of Apartment
Co-operative Societies Conveyance:
• Conveyance deed with builder’s consent • Deemed Conveyance – without builder’s consent

By |August 7th, 2019|Conveyance Services for Societies|Comments Off on CONVEYANCE SERVICES FOR SOCIETIES

WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION?

WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION?

1. The builder is interested in using the increased FSI which will be awarded by the govt. for that area at any time in future. If the ‘Society’ is formed, then upon the transfer and conveyance of land in favour of the Society, the increased FSI will be owned by the Society and the builder shall not have any right over it. But if it is an Apartment, then the builder owns that increased FSI and can use it anywhere. Thus, the builder will keep taking advantage of every increase in FSI throughout in the future.
2. In an Apartment, the builder retains the ownership of the open spaces which are not included in the saleable area. Example – Terrace or any open parking/stairs space which is not included in the saleable area. But in case of Society, the builder cannot retain any right on any of these areas and has to hand over everything to the Society. The Maharashtra Apartment Ownership Act also provides for the ownership of an individual Apartment in a building and to make such Apartment heritable and transferable property.
3. Bye-laws and Rules of ‘Society’ are binding on all the residents and nobody can act as per his/her whims. Hence, if the Society decides to ban any objectionable commercial activities in the flats such as noise-making music classes or using the flat for catering or courier activities etc or not to rent out to bachelors etc, then all the residents have to abide by it. But if it is an Apartment, then owners can violate the Apartment Rules and the Apartment Body can just file a case in the Civil Court. However, while the Society disputes are resolved in a separate Court i.e. Co-operative Court dealing with Society matters and hence they are fast resolved whereas, the Apartment matters have to be taken to the normal Civil Court and hence they typically take years and decades to resolve.
4. When the building contemplates redevelopment after 25-30 years, the Society’s decision will be final and hence the Society members will have negotiation power with the builder at that time. But if in case of an Apartment, the consent of every Apartment-owner is required and hence it goes into an endless delay due to lack of a common decision acceptable to everybody. There are many instances in Mumbai wherein finally the dilapidated buildings had to be forcefully vacated by an eviction order from Court since they became unlivable. Thus, while the decisions are taken on a ‘majority’ basis in Society, the Apartment goes with rule of ‘Acceptable by Everybody’. So if the builder has retained even one flat in an Apartment, he will play a veto card in his favour at the time of redevelopment.

By |August 6th, 2019|WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION|Comments Off on WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION?

SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER

SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER
The Registration process and requirements are governed by Maharashtra State Co-operative Society Act 1960.

To Register Co-op. Housing Society, Minimum 10 member are required.

Less than 10 members Societies are also Registered as per M.S.Govt. Ordinance No. 1094 and 277/14 Dated 10/03/1995. But such member’s flats should be less than 700 Sq.ft. Carpet Area

As per M.S. Govt. Notification dated 24/07/1992 conditions for registrations are liberalized.
60 % of the Promoters are must be ready to form Co-op. Housing Society.
If flats are sold as per the Maharashtra Ownership Flats Act,1963 [MOFA] then it is the duty of the Builder / Developer to form society and hand over the Account + Documents to Provisional Working Committee [PWC] In this case the builder become CP and other flat owners become Promoters for Registration purpose. This society registers under Co-operation.
When the builder is not registering society due to some reasons or not support to registered society then flat purchasers can apply for registration of Co-operative Housing Society under Non Co-operation. In this case one of the flat owners should be elected as CP for Registration purpose. In this case some more time is taken to registered society as registrar is issue notice to builder for Non Co-operation. If no response then ex-party decision are taken for registration of the society. Now all the case of Non Co-operation Registration decisions is given by District Deputy Registrar [DDR] then society is registered
All flat owners should hold meeting and elect Promoter. All power for Registrations, documentation etc. should be given to promoter. The resolution should be passed and must be sign by all flat owners who wish to become member of the Co-operative Housing Society
Appoint Consultant / Legal Advocate for registration and ask him to comply all requirements. All members together also can do work for registration.
For registration of Co-op. Hsg. Society the following documents should be filed to Dy. Registrar / Asst. Registrar of Co-operative Department area concern in order as follow:
• Applications for Name to be reserved for Proposed Society’s
• Form of resolution electing a CP and Promoter and giving them authority for doing certain acts on behalf of the proposed society
• Notice to Builder
• Application form “A”
• Information in Annexure ” A ” ” B ” ” C ”
• Bye-Law of the Society 2 copies
• Details of Accounts Annexure ” D ”
• Bank Balance Certificate in Original
• Namuna 6
• Agreement of 1 Flat
• Advocate Search Report [Title Certificate]
• Society’s Building Plan
• Lay Out Plan
• Sanction Plan from Authority
• Commencement Certificate
• Completion Certificate
• Promoter’s Guarantee in form ” X ” On Rs. 100/- Stamp paper & notarized
• Guarantee in form” Y ” On Rs. 100/- Stamp paper & notarized
• Guarantee in form ” Z ” On Rs. 100/- Stamp paper & notarized
• Latest 7/12 or City Survey Revenue Record of Land [not more than 1 month old]
• Promoters Affidavit On Rs. 100/- Stamp paper & notarized
• Indemnity Bond On Rs. 500/- Stamp paper & notarized
• NA Order
• ULC Order
• Development Agreement and Power of Attorney
• List of Members in the society
• Scheme/Yojana Form
• Registration Fee Challan for Rs.2500
• Builder Non Co-operation form Z On Rs. 100/- Stamp paper & notarized if required 1 copy
On submission of above document the Dy./Asst. Registrar will go through the papers And document. If found OK he will make order for issue of Registration Certificate.
If any deficiencies are found then the applicant will be inform accordingly and documents will be corrected wherever necessary. When all papers are in order, he will issue order for issue of Registration Certificate.
Registration Certificate is issued with covering letter and Officer’s name is mentioned who will attend First General Meeting. Normally the Officer concern is not attending meeting. In absence, all members has to hold meeting and has to elect Provisional Working Committee [PWC] whose working period will be ONE Year.
After electing PWC the member of PWC has to submitted the M-20 bond on Rs. 100/- stamp paper with the sign of Officer’s whose name is in Covering latter to Dy./Asst. Registrar. All Rule and Regulations, resolution and minutes which is written in AGM Register must be sign by Officer’s name is mentioned in covering letter it is the most important step.[Many society forget this which create problem latter] After First Annual General Meeting PWC is replaced with new Working Committee [WC] whose working period will be FIVE Year. The new WC election can conduct before PWC time over with proper election process. WC also has to submitted the M-20 bond on Rs. 100/- stamp paper with the sign of election officer to Dy./Asst. Registrar.
When application for Name reservation of Society has given, the Dy./Asst. Registrar give instruction to Open Bank Account in Dist. Central Co-op. Bank The Account has to opened in the name of CP And deposit all money of Share Capital Contribution [per member Share Money is Rs. 50*10 = Rs. 500 i.e. 10 share of 50 rupees each] and Member ship Fees of Rs. 100/- i.e. Per member you have to deposit Rs. 600/- in bank and obtain Bank Balance Certificate and submitted it to Dy./Asst. Registrar. After First Annual General Body Meeting the Bank Account has to transfer in the name of Society. For bank Account operation Chairman sign must and either Secretary and Treasurer. Expenditure has to be made as per provision of Bye-Laws. Bank and Cash Transaction [Collection and Payment are handled by Treasure when Billing Clerk or Accountant are not been kept.