CONVEYANCE VS DEEMED CONVEYANCE

Conveyance Deed is a document executed to transfer the title of land and building in favour of Society.

MEANING OF DEEMED CONVEYANCE:

The Promoter (Builder/ Developer) is legally required to convey the land and the building within 4 months of formation to the society or any legal body of the flat purchasers. However, it has been the experience that many promoters (Builders/Developers) have not conveyed the land and building to the legal bodies. Therefore, government has amended the Maharashtra Ownership Flats Act, 1963 (MOFA) and provided for the deemed conveyance in favour of the legal bodies. Under the provision, deemed conveyance means after the expiry of 4 months of formation of the legal body, the land and building is deemed to have been conveyed to the legal body and to bring the same in the revenue record, a Competent Authority has been designated who will hear the parties on the basis of applications received from the aggrieved party and transfers the title in favour of the legal body by passing the necessary order and deemed conveyance certificate and appoint an authorized officer to execute the conveyance deed in favour of the society and execute on behalf of non co-operative builder or the land owner. Getting the title of land and building by adopting the above procedure is known as deemed conveyance.

MEANING OF CONVEYANCE:
Conveyance means to transfer or convey anything to another person. In the legal sense Conveyance refers to the transfer of ownership or other interest in the property to the other party. Conveyance Deed is a document executed to transfer the title of land and building in favour of Society or Association of Persons (AOP).

DIFFERENCE BETWEEN THE DEEMED CONVEYANCE AND THE REGULAR CONVEYANCE

In case of regular conveyance, the builder/ Developer/ Land owner prepare a conveyance deed, execute the same and appear before the Sub-Registrar of assurance for admitting their signature. Without any problem, the legal bodies get the conveyance with the co-operation of the builder/ landowner.

In case of deemed conveyance, the builder/ land owner or their legal heirs are not co-operating, therefore, the aggrieved parties appear before the Designated Competent Authority, who hears all the parties and passes the necessary order of conveyance. Deemed Conveyance is obtained as a legal remedy against the defaulter builder/ landowner who don’t want to part with the land and the building in favour of the society.

By |November 29th, 2018|Uncategorized|Comments Off on CONVEYANCE VS DEEMED CONVEYANCE

Documentation for Deemed Conveyance

Documentation for Deemed Conveyance

Documentation is a very important & crucial stage in the Procedure for Deemed Conveyance. It requires absolute focus & meticulous handling to ensure that all the required documents are obtained & organized in an appropriate manner.

The Land Revenue Records of recent origin are obtained by making applications to the respective Government Departments like City Survey Office, Tahasildar/ Talathi Office & District Collector Office. These documents are obtained typically within 8- 10 weeks.

The Municipal Corporation Records are obtained by making application to the Building Proposal Department of the Municipal Corporation. These documents are obtained typically within 8- 10 weeks.
In case it is difficult to obtain the Land Revenue Records & Municipal Corporation Records, Right to Information (RTI) may be invoked.

The Society Records are obtained from Society Office & the Professional Certificates are obtained from Professionals.

Following Documents are required to be prepared.
 Deemed Conveyance Application- Form VII
 Synopsis of the Case
 Vakalatnama
 Roznama
 Society Special General Body Resolution
 Letter of Authority
 Affidavit by Authorised Representative
 Affidavit by Society Secretary
 List of Society Members including their Flat/ Shop Agreement Details

During the Documentation Stage, a Legal Notice is to be sent to the Land Owners & Property developers.
The complete set of the above Documents is to be annexed with the Deemed Conveyance Application- Form VII & to be filed in a neat & tidy manner.

The complete Deemed Conveyance Application- Form VII is to submitted to the Competent Authority- The District Deputy Registrar of Co- Operative Societies of the particular District.

The Documentation Stage from beginning to submission of Deemed Conveyance Application- Form VII can be successfully completed within 90 to 120 days.

By |November 28th, 2018|Documentation for Deemed Conveyance:-|Comments Off on Documentation for Deemed Conveyance

Need for Deemed Conveyance

Need for Deemed Conveyance

A Co- Operative Housing Society is the owner of the Land & Building & individual member enjoys the ownership right of the Flat/ Shop based on the Share Certificate issued by the Co- Operative Housing Society.

A vast majority of Co- Operative Housing Societies does not have the Conveyance in their favour & hence are not the owners of their Land & Building. In this situation, even though each member of the Co- Operative Housing Society has paid full consideration and is in possession of the Flat/ Shop allotted, he does not enjoy the benefits of title ownership of the Flat/ Shop.

In case of Co-Operative Housing Societies formed long back, many of the Buildings are in dilapidated condition and their repairs are not economically viable. The best solution available for these Co- Operative Housing Societies is to go ahead with Redevelopment. The non- availability of the Conveyance & therefore free/ marketable Title affects the Redevelopment Process badly.

In case of Co- Operative Housing Societies formed recently, the Redevelopment at the moment is not on the agenda. However the non- availability of the Conveyance and free and marketable Title may affect its present Revenue and may be a hindrance in Redevelopment process in future.

Therefore Deemed Conveyance is in the larger interest of the Co- Operative Housing Societies (and their each and every member) who are denied their right of Conveyance by the Land- Owners & Property Developers.

By |November 28th, 2018|NEED FOR DEEMED CONVEYANCE|Comments Off on Need for Deemed Conveyance

CHECKLIST FOR HANDOVER OF SOCIETY FROM BUILDER

CHECKLIST FOR HANDOVER OF SOCIETY FROM BUILDER

During the handover procedure it is important to record and file all details related to the process so that even if problems arise years later, all you need to do is look through this set of records and, accordingly, figure out what to do next.

The builder-residents society handover procedure needs to be structured, but that’s not where the process ends. There are a few things you should remember to check even after the builder hands over your society.

1)Make sure all society related issues are recorded and filed: All defects that you find should be typed as a letter with a signed acknowledgement of the same from the builder, so he is obligated to fix them. All important e-mails should be printed and kept safely for future references.

2)Make sure you make good use of the builder provided warranty period: Builders generally offer a warranty period within which defects are to be pointed out and duly fixed.

3)Form a team of volunteers to check and cross check all formalities are done correctly: Apart from the Management Committee, it is recommended that you bring together a group of residents to volunteer in making sure all necessary documents have been collected and all required formalities have been done. (To learn what documents you need during society handover, read ‘Keep a Check on These When Builder Hands Over Your Housing Society’)

4)Get a community management software to help you keep a permanent track of records: Getting a society management portal will prove significantly helpful in the overall management of your community activities in the long run. (For example: Common Floor Groups portal. With its many features such as Discussion, Complaints, My Dues, Issue Tracker, Documents repository this portal will serve as a platform to execute and manage community related activities effectively.)

5)Keep originals safely and copies separately with the Committee President: Make sure you keep originals of documents at a safe place such as the Association office and their copies with the Committee President which, when his tenure ends, are passed on to his successor.

6)Make sure you have all documents mentioned on the ‘Handover’ Checklist: Double check that you have all documents mentioned on the handover checklist in ‘Keep a Check on These When Builder Hands Over Your Housing Society’.

By |November 28th, 2018|CHECKLIST FOR HANDOVER OF SOCIETY FROM BUILDER|Comments Off on CHECKLIST FOR HANDOVER OF SOCIETY FROM BUILDER

WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION

*WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION?

1. The builder is interested in using the increased FSI which will be awarded by the govt. for that area at any time in future. If the ‘Society’ is formed, then upon the transfer and conveyance of land in favour of the Society, the increased FSI will be owned by the Society and the builder shall not have any right over it. But if it is an Apartment, then the builder owns that increased FSI and can use it anywhere. Thus, the builder will keep taking advantage of every increase in FSI throughout in the future.

2. In an Apartment, the builder retains the ownership of the open spaces which are not included in the saleable area. Example – Terrace or any open parking/stairs space which is not included in the saleable area. But in case of Society, the builder cannot retain any right on any of these areas and has to hand over everything to the Society. The Maharashtra Apartment Ownership Act also provides for the ownership of an individual Apartment in a building and to make such Apartment heritable and transferable property.

3. Bye-laws and Rules of ‘Society’ are binding on all the residents and nobody can act as per his/her whims. Hence, if the Society decides to ban any objectionable commercial activities in the flats such as noise-making music classes or using the flat for catering or courier activities etc or not to rent out to bachelors etc, then all the residents have to abide by it. But if it is an Apartment, then owners can violate the Apartment Rules and the Apartment Body can just file a case in the Civil Court. However, while the Society disputes are resolved in a separate Court i.e. Co-operative Court dealing with Society matters and hence they are fast resolved whereas, the Apartment matters have to be taken to the normal Civil Court and hence they typically take years and decades to resolve.

4. When the building contemplates redevelopment after 25-30 years, the Society’s decision will be final and hence the Society members will have negotiation power with the builder at that time. But if in case of an Apartment, the consent of every Apartment-owner is required and hence it goes into an endless delay due to lack of a common decision acceptable to everybody. There are many instances in Mumbai wherein finally the dilapidated buildings had to be forcefully vacated by an eviction order from Court since they became unlivable. Thus, while the decisions are taken on a ‘majority’ basis in Society, the Apartment goes with rule of ‘Acceptable by Everybody’. So if the builder has retained even one flat in an Apartment, he will play a veto card in his favour at the time of redevelopment.

By |November 28th, 2018|WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION|Comments Off on WHY A CO-OPERATIVE HOUSING SOCIETY IS BETTER THAN APARTMENT OWNERS ASSOCIATION

SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER

SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER
The Registration process and requirements are governed by Maharashtra State Co-operative Society Act 1960.

To Register Co-op. Housing Society, Minimum 10 member are required.

Less than 10 members Societies are also Registered as per M.S.Govt. Ordinance No. 1094 and 277/14 Dated 10/03/1995. But such member’s flats should be less than 700 Sq.ft. Carpet Area

As per M.S. Govt. Notification dated 24/07/1992 conditions for registrations are liberalized.
60 % of the Promoters are must be ready to form Co-op. Housing Society.
If flats are sold as per the Maharashtra Ownership Flats Act,1963 [MOFA] then it is the duty of the Builder / Developer to form society and hand over the Account + Documents to Provisional Working Committee [PWC] In this case the builder become CP and other flat owners become Promoters for Registration purpose. This society registers under Co-operation.
When the builder is not registering society due to some reasons or not support to registered society then flat purchasers can apply for registration of Co-operative Housing Society under Non Co-operation. In this case one of the flat owners should be elected as CP for Registration purpose. In this case some more time is taken to registered society as registrar is issue notice to builder for Non Co-operation. If no response then ex-party decision are taken for registration of the society. Now all the case of Non Co-operation Registration decisions is given by District Deputy Registrar [DDR] then society is registered
All flat owners should hold meeting and elect Promoter. All power for Registrations, documentation etc. should be given to promoter. The resolution should be passed and must be sign by all flat owners who wish to become member of the Co-operative Housing Society
Appoint Consultant / Legal Advocate for registration and ask him to comply all requirements. All members together also can do work for registration.
For registration of Co-op. Hsg. Society the following documents should be filed to Dy. Registrar / Asst. Registrar of Co-operative Department area concern in order as follow:
• Applications for Name to be reserved for Proposed Society’s
• Form of resolution electing a CP and Promoter and giving them authority for doing certain acts on behalf of the proposed society
• Notice to Builder
• Application form “A”
• Information in Annexure ” A ” ” B ” ” C ”
• Bye-Law of the Society 2 copies
• Details of Accounts Annexure ” D ”
• Bank Balance Certificate in Original
• Namuna 6
• Agreement of 1 Flat
• Advocate Search Report [Title Certificate]
• Society’s Building Plan
• Lay Out Plan
• Sanction Plan from Authority
• Commencement Certificate
• Completion Certificate
• Promoter’s Guarantee in form ” X ” On Rs. 100/- Stamp paper & notarized
• Guarantee in form” Y ” On Rs. 100/- Stamp paper & notarized
• Guarantee in form ” Z ” On Rs. 100/- Stamp paper & notarized
• Latest 7/12 or City Survey Revenue Record of Land [not more than 1 month old]
• Promoters Affidavit On Rs. 100/- Stamp paper & notarized
• Indemnity Bond On Rs. 500/- Stamp paper & notarized
• NA Order
• ULC Order
• Development Agreement and Power of Attorney
• List of Members in the society
• Scheme/Yojana Form
• Registration Fee Challan for Rs.2500
• Builder Non Co-operation form Z On Rs. 100/- Stamp paper & notarized if required 1 copy
On submission of above document the Dy./Asst. Registrar will go through the papers And document. If found OK he will make order for issue of Registration Certificate.
If any deficiencies are found then the applicant will be inform accordingly and documents will be corrected wherever necessary. When all papers are in order, he will issue order for issue of Registration Certificate.
Registration Certificate is issued with covering letter and Officer’s name is mentioned who will attend First General Meeting. Normally the Officer concern is not attending meeting. In absence, all members has to hold meeting and has to elect Provisional Working Committee [PWC] whose working period will be ONE Year.
After electing PWC the member of PWC has to submitted the M-20 bond on Rs. 100/- stamp paper with the sign of Officer’s whose name is in Covering latter to Dy./Asst. Registrar. All Rule and Regulations, resolution and minutes which is written in AGM Register must be sign by Officer’s name is mentioned in covering letter it is the most important step.[Many society forget this which create problem latter] After First Annual General Meeting PWC is replaced with new Working Committee [WC] whose working period will be FIVE Year. The new WC election can conduct before PWC time over with proper election process. WC also has to submitted the M-20 bond on Rs. 100/- stamp paper with the sign of election officer to Dy./Asst. Registrar.
When application for Name reservation of Society has given, the Dy./Asst. Registrar give instruction to Open Bank Account in Dist. Central Co-op. Bank The Account has to opened in the name of CP And deposit all money of Share Capital Contribution [per member Share Money is Rs. 50*10 = Rs. 500 i.e. 10 share of 50 rupees each] and Member ship Fees of Rs. 100/- i.e. Per member you have to deposit Rs. 600/- in bank and obtain Bank Balance Certificate and submitted it to Dy./Asst. Registrar. After First Annual General Body Meeting the Bank Account has to transfer in the name of Society. For bank Account operation Chairman sign must and either Secretary and Treasurer. Expenditure has to be made as per provision of Bye-Laws. Bank and Cash Transaction [Collection and Payment are handled by Treasure when Billing Clerk or Accountant are not been kept.

By |November 28th, 2018|SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER|Comments Off on SOCIETY FORMATION AND HANDOVER PROCESS BY BUILDER

FORMATION OF A NEW HOUSING SOCIETY

First general body meeting (before registration)

In this meeting under Society’s Model Bye-law 3(iii), the Chief Promoter (could be the builder) is primarily selected by the promoters, who are members co-signing the registration application before the Registering Authority, under Bye-law 3(xii).

Application for registration

Normally, the name reservation proposal should be accompanied with the society resolutions and signatures of at least 10 Promoters who have attended the meeting. On allotment of name and permission to open a bank account by the Registrar, the Chief Promoter has to collect Share Capital, Entrance Fees from promoters and deposit the same in the branch of the bank permitted by the Registrar. It should be noted that the amount cannot be withdrawn from the Bank till the society is registered or its registration is refused, except with prior written permission of the Registrar. The Chief Promoter should submit registration proposal to the registering authority within a period of 3 months from the date of issue of Letter of Reservation in the name of the proposed society.

Co-operative Societies Commissioner & Registrar’s GR No. SAGRUVO/1094/Pra.Kra 277/14C dated 10 March 1995 says “By exercising the powers in section 7 of the Co-operative Societies Act 1960 the government is pleased to exempt the provision of minimum 10 members for registering co-operative Housing society under sub-clause 1 in Section 6 of the said Act subject to the conditions that the plinth area of each flat in the proposed co-operative Housing Society should not be more than 700 sq. ft and FSI should not be balance for utilization in the proposed societies land/ building.

If builder/ promoter is not co-operating in registering the Co-operative Housing Society, then in that case, the application for registration of society be submitted in Form 6 (Rule 12) before the District Deputy Registrar, who has been given power under section 10(1) of the Maharashtra Ownership Flats Act 1963. While submitting the said proposal, a Notarized Indemnity Bond of the members who applied for the registration of society on the stamp paper of Rs. 200 is required.

Approval by Registrar

It is the duty of the concerned Registrar to register the Co-operative Housing Society, by scrutinizing the proposal submitted after fulfillment of above mentioned documents, and shall make an arrangement of issuing certificate of registration society under Section 9(1) of the Maharashtra Co-operative Society Act 1960, and copy of the registered bye-law, memorandum regarding registration of society to the chief promoter. The order regarding registration of society should have been sent for publishing in government gazette to the Government Printing Press for appropriate action. It is necessary to take decision on the registration of the society within a period of two months from the date of the proposal of the society submitted to the Registrar.

If proposal of society registration is denied or no decision is taken within two months then it is necessary to send that proposal to the Divisional Joint Registrar, Co-operative Societies under Section 152 of the Maharashtra Co. operative societies Act, can be approached.

First General Body Meeting obligatory Agenda (after registration):
• To elect a Chairman for the meeting
• To admit persons to membership who have applied for membership of the society.
• To elect a provisional Managing Committee
• To receive and approve the statement of account as prepared by the Chief Promoter of the society up to 14 days prior to the first general body meeting of the society.
• To authorize the committee to secure conveyance of right title and interest in the property in the name of the society from the promoter builder
• To impose restrictions on raising loan amount from outside
• To appoint internal auditor and to fix his remuneration
• To authorize one of the members of the provisional committee to call the first meeting of the provisional committee
• To take decision about taking membership of District Housing Federation and other institutions
• To give power to one member of provisional management committee to call meeting of the managing committee
• To consider the matters raised by the member except these matters which are necessary for giving advance notice with the permission of chairman and eleventh hour matter and to make resolution in that regard.

By |November 27th, 2018|Formation / Registration of Co-operative Housing Societies in Pune|Comments Off on

ADVOCATES FOR REGISTRATION OF HOUSING SOCIETY

ADVOCATES FOR REGISTRATION OF HOUSING SOCIETY:

A co-operative society is the perfect fit for a residential building as flat-owners have common needs (water connection, watchmen, etc) and interests (maintenance of common areas, such as the terrace and compound). If you’ve purchased a flat in a new building, it would probably be best if you took interest in forming a society. The builder may also be statutorily obligated to form a society. For example, under Maharashtra Flat Ownership Act, 1963, a builder must form a society within four months of selling 60% of the flats.

But you needn’t wait for the builder to form the society. In many states, including Delhi and Maharashtra, ten flat-owners are enough to promote a co-operative housing society. A building without a housing society usually indicates that there is a dispute between members or a general lack of interest. If you’re considering buying a house in a building where the society has not been formed, find out what the problem is. If the builder does not form a society, rights to the terrace and the compound continue to rest with him.

We, the “VED LEGAL” provide registration and formation services which help you at every step of society formation, right from inception to final handover. We look after all the legal complications involved in society formation and carry out necessary negotiations with developers.

We have also completed the registration process for various projects. We specialize in society formation of housing societies, commercial societies, maintenance societies and large townships. We help developers and societies with complex registration process during society mergers, society split, and federation registrations.

Our specialized services include:
• Initial screening
• Gap identification and ratification
• Process documentation and finalization
• Dispute resolution
• Society name reservation at respective co-operative departments
• Account formation and legal documentation

FOR MORE DETAILS CALL:
VED LEGAL,
Adv. Gajanan Rahate
Mob: 9763040088
E_mail: [email protected]

By |November 27th, 2018|ADVOCATES FOR REGISTRATION OF HOUSING SOCIETY:|Comments Off on ADVOCATES FOR REGISTRATION OF HOUSING SOCIETY

CONVEYANCE SERVICES FOR SOCIETIES:-

CONVEYANCE SERVICES FOR SOCIETIES:-

In most of the cases people believe that a Purchase Agreement is the final document they need to own. However, a mere purchase agreement does not pass on the developer’s rights on the land to the society. Societies need to make sure they have the complete right to the land, and mere society registration and formation does not provide those rights.

A Conveyance Deed helps societies to gain the right of their land. Post this builder relinquishes his legal right on the land.

We the “VED LEGAL” provide end-to-end conveyance services to the societies including execution of Conveyance Deed, Deemed Conveyance, and Deed of Apartments. We work closely with co-operative societies and government officials and make sure the complete process is hassle free.

With our team of legal advisers and professional approach, we have handled more than 100 cases across Pune. We guide our clients through the complete process of transferring builder’s rights, allocation of additional space and finally establishment of society rights, as per the law.

Our conveyance services include:

Apartment formation:
• Deed of Declaration • Deed of Apartment
Co-operative Societies Conveyance:
• Conveyance deed with builder’s consent • Deemed Conveyance – without builder’s consent

By |November 27th, 2018|Conveyance Services for Societies|Comments Off on CONVEYANCE SERVICES FOR SOCIETIES:-

CONVEYANCE VS DEEMED CONVEYANCE

CONVEYANCE VS DEEMED CONVEYANCE

Conveyance Deed is a document executed to transfer the title of land and building in favour of Society.

MEANING OF DEEMED CONVEYANCE:

The Promoter (Builder/ Developer) is legally required to convey the land and the building within 4 months of formation to the society or any legal body of the flat purchasers. However, it has been the experience that many promoters (Builders/Developers) have not conveyed the land and building to the legal bodies. Therefore, government has amended the Maharashtra Ownership Flats Act, 1963 (MOFA) and provided for the deemed conveyance in favour of the legal bodies. Under the provision, deemed conveyance means after the expiry of 4 months of formation of the legal body, the land and building is deemed to have been conveyed to the legal body and to bring the same in the revenue record, a Competent Authority has been designated who will hear the parties on the basis of applications received from the aggrieved party and transfers the title in favour of the legal body by passing the necessary order and deemed conveyance certificate and appoint an authorized officer to execute the conveyance deed in favour of the society and execute on behalf of non co-operative builder or the land owner. Getting the title of land and building by adopting the above procedure is known as deemed conveyance.

By |November 27th, 2018|Conveyance Vs Deemed Conveyance|Comments Off on CONVEYANCE VS DEEMED CONVEYANCE